Clarkstown, NY Solar Energy: Expedited Solar Permitting (2026)
Key Facts
- Program
- Unified statewide solar permit, § 247-9
- Permit type
- Combined building + electrical permit
- Required checklist
- Unified Solar Permit Eligibility Checklist
- Plan sets required
- Three sets: site plan, electrical diagram, specs
- Other chapters still apply
- § 247-10: Ch. 270 and Ch. 249A not excused
Summary
Clarkstown runs a Solar Panel Fast-Track Program under Town Code § 247-9 that issues a combined building and electrical permit for grid-tied residential PV systems using New York State's unified solar permit form and checklist.
The expedited solar permitting process uses a unified permit across municipalities in New York State. A combined building and electrical permit for a grid-tied photovoltaic (PV) system will be issued pending proper completion of forms, submission of approved plans and approval by the municipality. All applicants must submit: A. Unified Solar Permit Eligibility Checklist (annexed as Attachment 1). B. Three sets of plans that include: (1) Site plan showing location of major components of solar system and other equipment on roof or legal accessory building. ... (2) One-line or three-line electrical diagram. ... (3) Specification sheets for all manufactured components. If these sheets are available electronically, a web address will be accepted in place of an attachment, at the discretion of the Building Inspector.
Full Breakdown
Section 247-9, "Solar Panel Fast-Track Program," tells applicants that "the expedited solar permitting process uses a unified permit across municipalities in New York State," and that a single combined building and electrical permit for a grid-tied photovoltaic system issues once the forms are properly completed, plans are submitted and the municipality signs off. Every applicant must submit the Unified Solar Permit Eligibility Checklist, annexed to the chapter as Attachment 1, along with three sets of plans. Those plans must include a site plan showing the array, existing electrical service location, utility meter, inverter location, system orientation, tilt angle, and any access pathways that need to comply with the New York State Fire Code; a one-line or three-line electrical diagram (the same one used for a NYSERDA incentive application or a utility interconnection agreement satisfies this); and specification sheets for every manufactured component, which the Building Inspector may accept as a web link instead of a paper attachment.
All diagrams and plans must also state the project address, section/block/lot, the owner's contact information, the plan preparer's contact information, and the system's DC capacity in kW. Section 247-10 makes clear the fast-track program does not excuse compliance with other applicable chapters, including Chapter 270 and the Chapter 249A stormwater rules, so a project that also disturbs 10,000 square feet or more of land still needs a separate stormwater pollution prevention plan even while moving through the expedited track.
Violations & Fines
A fast-tracked system installed without completing the Unified Solar Permit Eligibility Checklist, submitting the required plan sets, or clearing any other chapter the project triggers (such as the Chapter 249A stormwater rules cross-referenced in § 247-10) falls under the general Chapter 247 penalty in § 247-11: a fine up to $1,000 and/or imprisonment up to one year, with each day of continued noncompliance a separate offense.
Frequently Asked Questions
What is Clarkstown's Solar Fast-Track Program?
What plans does the fast-track application need?
Does the fast-track program skip stormwater review?
Sources & Official References
Other rules in Clarkstown
New York rules heatmap·Compare Clarkstown to another location·View the New York solar energy overview