Fontana, CA Solar Energy: Expedited Solar Permitting (2026)
Key Facts
- System size cap
- 10 kW AC / 30 kW thermal
- Adopted
- Ord. No. 1732, 8-25-15
- Inspections allowed
- One, by Building & Safety
- HOA approval
- City cannot require it first
- Legal basis
- Solar Rights Act / AB 2188
Summary
Fontana runs a nondiscretionary expedited permit track for small residential rooftop solar systems up to 10kW AC, required under Article XX (Sec. 5-602 et seq.) to comply with the state Solar Rights Act as amended by AB 2188. Applicants get electronic submittal, a standard checklist, and just one building-and-safety inspection.
Sec. 5-602. - Applicability and purpose. This article applies to the permitting of all small residential rooftop solar energy systems in the city. The purpose of this article is to create an expedited, streamlined solar permitting process that complies with the Solar Rights Act, as amended by AB 2188... Sec. 5-604. - Small residential rooftop solar system requirements. (c)The building official shall, prior to September 30, 2015, adopt an administrative, nondiscretionary expedited review process for small residential rooftop solar energy systems, which shall include standard plan(s) and checklist(s)... Sec. 5-608. - Inspections. (a)Only one inspection shall be required and performed by the building and safety division for small residential rooftop solar energy systems eligible for expedited review.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 64 | Zoning and Development Code: Supplement 17).
Full Breakdown
Article XX of Chapter 5, added by Ord. No. 1732 on August 25, 2015, applies to every small residential rooftop solar energy system in the city, defined as a system no larger than 10 kilowatts AC (or 30 kilowatts thermal) installed on a single or duplex dwelling that meets state fire, structural and electrical code standards. Sec. 5-604(c) required the building official to adopt an administrative, nondiscretionary expedited review process, including standard plans and a compliance checklist, by September 30, 2015, modeled on the California Solar Permitting Guidebook published by the Governor's Office of Planning and Research.
Before filing, Sec. 5-605 requires the applicant to verify, using standard engineering methods, that the roof structure can carry the added wind, seismic and dead/live loads, and, at the applicant's own cost, that the existing electrical panel and wiring can carry the new photovoltaic load. Sec. 5-606 guarantees electronic submittal of all application documents and accepts electronic signatures in place of a wet signature. Under Sec. 5-607, an application meeting the checklist is deemed complete on submission; an incomplete one draws a written correction notice listing every deficiency, and the city cannot condition approval on approval from a homeowners' association under Civil Code Section 4080.
Sec. 5-608 caps review to a single inspection by the building and safety division for systems eligible for expedited review, though a failed system may be reinspected outside the article's timing rules.
Violations & Fines
The article does not set a fine schedule; noncompliant installations are handled as ordinary building-permit deficiencies, correctable through the Sec. 5-607 correction-notice process, with unpermitted solar work otherwise subject to the city's general Code penalty, Sec. 1-7, up to $1,000.00 or six months' imprisonment as a misdemeanor.
Frequently Asked Questions
What size solar system qualifies for expedited review in Fontana?
How many inspections will Fontana require?
Can my HOA block city approval of my solar permit?
Sources & Official References
Other rules in Fontana
California rules heatmap·Compare Fontana to another location·View the California solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Expedited Solar Permitting in Nearby Cities
How other cities in San Bernardino County handle expedited solar permitting.