Fontana, CA Solar Energy: Expedited Solar Permitting (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

System size cap
10 kW AC / 30 kW thermal
Adopted
Ord. No. 1732, 8-25-15
Inspections allowed
One, by Building & Safety
HOA approval
City cannot require it first
Legal basis
Solar Rights Act / AB 2188

Summary

Fontana runs a nondiscretionary expedited permit track for small residential rooftop solar systems up to 10kW AC, required under Article XX (Sec. 5-602 et seq.) to comply with the state Solar Rights Act as amended by AB 2188. Applicants get electronic submittal, a standard checklist, and just one building-and-safety inspection.

Sec. 5-602. - Applicability and purpose. This article applies to the permitting of all small residential rooftop solar energy systems in the city. The purpose of this article is to create an expedited, streamlined solar permitting process that complies with the Solar Rights Act, as amended by AB 2188... Sec. 5-604. - Small residential rooftop solar system requirements. (c)The building official shall, prior to September 30, 2015, adopt an administrative, nondiscretionary expedited review process for small residential rooftop solar energy systems, which shall include standard plan(s) and checklist(s)... Sec. 5-608. - Inspections. (a)Only one inspection shall be required and performed by the building and safety division for small residential rooftop solar energy systems eligible for expedited review.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 64 | Zoning and Development Code: Supplement 17).

Full Breakdown

Article XX of Chapter 5, added by Ord. No. 1732 on August 25, 2015, applies to every small residential rooftop solar energy system in the city, defined as a system no larger than 10 kilowatts AC (or 30 kilowatts thermal) installed on a single or duplex dwelling that meets state fire, structural and electrical code standards. Sec. 5-604(c) required the building official to adopt an administrative, nondiscretionary expedited review process, including standard plans and a compliance checklist, by September 30, 2015, modeled on the California Solar Permitting Guidebook published by the Governor's Office of Planning and Research.

Before filing, Sec. 5-605 requires the applicant to verify, using standard engineering methods, that the roof structure can carry the added wind, seismic and dead/live loads, and, at the applicant's own cost, that the existing electrical panel and wiring can carry the new photovoltaic load. Sec. 5-606 guarantees electronic submittal of all application documents and accepts electronic signatures in place of a wet signature. Under Sec. 5-607, an application meeting the checklist is deemed complete on submission; an incomplete one draws a written correction notice listing every deficiency, and the city cannot condition approval on approval from a homeowners' association under Civil Code Section 4080.

Sec. 5-608 caps review to a single inspection by the building and safety division for systems eligible for expedited review, though a failed system may be reinspected outside the article's timing rules.

Violations & Fines

The article does not set a fine schedule; noncompliant installations are handled as ordinary building-permit deficiencies, correctable through the Sec. 5-607 correction-notice process, with unpermitted solar work otherwise subject to the city's general Code penalty, Sec. 1-7, up to $1,000.00 or six months' imprisonment as a misdemeanor.

Frequently Asked Questions

What size solar system qualifies for expedited review in Fontana?
A small residential rooftop system no larger than 10 kilowatts AC nameplate rating, or 30 kilowatts thermal, installed on a single or duplex family dwelling, under Sec. 5-603's definition.
How many inspections will Fontana require?
Sec. 5-608 limits expedited-review systems to a single inspection by the building and safety division, though a system that fails may receive a follow-up inspection outside the article's standard timing.
Can my HOA block city approval of my solar permit?
No. Sec. 5-607(e) bars the city from conditioning application approval on approval from an association as defined in Civil Code Section 4080.

Sources & Official References

Other rules in Fontana

All Fontana rules

California rules heatmap·Compare Fontana to another location·View the California solar energy overview

Get notified when Expedited Solar Permitting in Fontana, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Expedited Solar Permitting in Nearby Cities

How other cities in San Bernardino County handle expedited solar permitting.

Chino, CA
Light Restrictions
Rancho Cucamonga, CA
Light Restrictions
Ontario, CA
Light Restrictions
Rialto, CA
Some Restrictions