Gresham, OR Solar Energy: Expedited Solar Permitting (2026)

Few Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit needed
Building Permit only
Development Permit
Not required if compliant
Height limit
No higher than roof peak
Mounting
Must be parallel to roof slope
Historic property
Exemption lost, full review applies

Summary

Gresham exempts qualifying rooftop solar installations from Planning Development Permit review entirely: only a Building Permit is required, skipping design review and land-use approval for most homes.

The following activities do not require a Planning Development Permit but will require a Building Permit: 1. Roof-top solar energy systems where the system meets the following: a. Is installed on the roof of a residential, commercial/mixed-use, industrial, or institutional structure; and b. Does not exceed the peak height of the portion of the roof on which it is installed; and c. Does not increase the footprint of the residential, commercial/mixed-use or industrial structure; and d. Is installed parallel to the slope of the roof; and e. Is not listed in the exceptions of Section 11.0102.H.

Full Breakdown

Under the Community Development Code, rooftop solar energy systems on residential, commercial/mixed-use, industrial, or institutional structures skip Development Permit review and need only a Building Permit, so long as the system doesn't exceed the roof's peak height, doesn't enlarge the building's footprint, and is mounted parallel to the roof slope. Systems on federally or locally designated historic buildings, in historic or conservation districts, or mounted on a frame more than 18 inches off the roof lose the exemption and need both a Building Permit and a Development Permit.

Violations & Fines

A system that fails the exemption tests, taller than the roof peak, expands the footprint, sits on a frame over 18 inches off the roof, or is on a historic landmark, must go through full Development Permit review before a Building Permit can issue; installing without it can trigger a stop-work order and code enforcement.

Frequently Asked Questions

Do I need a land-use permit for rooftop solar in Gresham?
No, if it meets the code's conditions: you only need a Building Permit, not a separate Development Permit.
What disqualifies a solar install from the streamlined permit?
Exceeding the roof's peak height, expanding the building footprint, non-parallel mounting, or being on a historic landmark or district.

Sources & Official References

Other rules in Gresham

All Gresham rules

Compare Gresham to another location·View the Oregon solar energy overview

Get notified when Expedited Solar Permitting in Gresham, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.