Highland, CA Solar Energy: Expedited Solar Permitting (2026)
Key Facts
- Over-the-counter permit
- Issued the same day for complete applications
- Electronic applications
- Permit issued within one to three business days
- Inspections required
- Only one for eligible systems
- Inspection scheduling
- Best efforts within two business days, two-hour window
- Scope of review
- Local, state, and federal health and safety requirements
- Fees
- Set by resolution of the Highland City Council
Summary
In the City of Highland, California, a complete application for a small residential rooftop solar energy system gets its building permit the same day at the counter or within one to three business days when filed electronically. Chapter 15.80 of the Highland Municipal Code limits review to health and safety and requires only one inspection.
§ 15.80.030. Permit application review. A. An application that satisfies the information requirements in the checklist(s) and standard plan(s) shall be deemed complete. B. If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission. C. The building official shall issue a building permit for any complete application that meets the requirements of the approved checklist(s) and standard plan(s) as follows: the same day for over-the-counter applications, within one to three business days for electronic applications, or as soon thereafter as may be practicable. Review of the application shall be limited to the building official's review of whether the application meets local, state, and federal health and safety requirements. D. Any condition imposed on an application shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.
Full Breakdown
Chapter 15.80 of the Highland Municipal Code, adopted by Ordinance 401 in 2015, sets the expedited track for small residential rooftop solar systems in the City of Highland, San Bernardino County. Section 15.80.010 does not write its own definitions. It borrows the meaning of "electronic submittal" and "small residential rooftop solar energy system" from the Solar Rights Act, Government Code Section 65850.5(j)(2) and (j)(3).
Under § 15.80.020 the city must adopt standard plans and a checklist of every requirement a system has to meet to qualify. Those documents must substantially conform to the California Solar Permitting Guidebook adopted by the Governor's Office of Planning and Research, and everything needed to apply must be posted on the city website. Electronic applications go through the method the building official specifies, and an applicant's electronic signature is accepted in place of a wet signature.
Section 15.80.030 governs the review itself. An application that satisfies the checklist and standard plan is deemed complete. An incomplete application draws a written correction notice that lists all deficiencies and any added information needed for expedited issuance. The building official then issues the permit the same day for over-the-counter applications or within one to three business days for electronic applications. Review is confined to whether the application meets local, state, and federal health and safety requirements, and any condition must be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost.
Section 15.80.040 allows inspection requests by electronic submittal and permits only one inspection for eligible systems. The building official uses best efforts to schedule it within two business days and to offer a two-hour window. A failed inspection is followed by another inspection that does not have to meet those timing rules. Under § 15.80.050, permit and inspection fees are set by resolution of the city council.
Violations & Fines
Chapter 15.80 contains no penalty clause of its own, because it binds the city's review timeline rather than the applicant. A defective filing produces a written correction notice and a resubmission. A system that fails inspection is followed by a further inspection, and the building official is not held to the two-business-day scheduling target for that follow-up visit.
Frequently Asked Questions
How fast does Highland issue a rooftop solar permit?
What happens if my Highland solar application is incomplete?
How many inspections does a small residential rooftop system get in Highland?
Can Highland add conditions to a solar permit?
Sources & Official References
Other rules in Highland
California rules heatmap·Compare Highland to another location·View the California solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Expedited Solar Permitting in Nearby Cities
How other cities in San Bernardino County handle expedited solar permitting.