Camarillo, CA Solar Energy: Panel Permits (2026)
Key Facts
- System size cap
- 10 kW AC or 30 kW thermal
- Eligible dwellings
- Single or duplex-family homes only
- Governing chapter
- Municipal Code Chapter 16.54, Solar Energy Systems
- Application method
- Electronic submittal and e-signature accepted
- HOA cost limit
- $1,000 max added cost for PV systems
- Appeal deadline
- 10 days to planning commission
Summary
Small residential rooftop solar systems in Camarillo go through a streamlined permit process under Municipal Code Chapter 16.54, built around a standard checklist that mirrors the state's Solar Permitting Guidebook. Systems must meet state fire, structural, and electrical codes, and applicants can submit everything, including signatures, electronically.
A.The building and safety department will adopt and maintain standard plans and a checklist of all requirements with which small residential rooftop solar energy systems must comply to be eligible for expedited review.B.The city's standard plans and checklist will substantially conform to state recommendations for expedited permitting, including the checklist and standard plans contained in the most current version of the California Solar Permitting Guidebook adopted by the Governor's Office of Planning and Research.C.All documents required for the submission of an expedited solar energy system application will be made available on the publicly accessible city Website.D.Applicants for small residential rooftop solar energy system permits may make electronic submittals of the required permit application and documents by email and the Internet.E.An applicant's electronic signature will be accepted on all forms, applications, and other documents in lieu of a wet signature.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27 Update 1).
Full Breakdown
Chapter 16.54 implements the California Solar Rights Act and AB 2188's amendments to Civil Code Section 714 and Government Code Section 65850.5 for what the code calls a 'small residential rooftop solar energy system,' defined in Section 16.54.020 as a system no larger than 10 kilowatts AC or 30 kilowatts thermal, installed on a single or duplex-family dwelling, that meets state fire, structural, and electrical codes and does not exceed the zone's maximum legal building height.
Under Section 16.54.040, every system must meet applicable state, city, and fire-department health and safety standards; water-heating systems need certification from an accredited listing agency under the California Plumbing and Mechanical Code, and photovoltaic systems must meet California Electrical Code and Underwriters Laboratories standards, plus Public Utilities Commission safety and reliability rules where applicable. Section 16.54.050 requires the building and safety department to publish a standard plan and checklist on the city website that substantially conforms to the state's Solar Permitting Guidebook from the Governor's Office of Planning and Research. Applicants can submit the application and every supporting document electronically, by email or through the internet, and an electronic signature is accepted in place of a wet signature on every form.
Fees for these permits must comply with Government Code Sections 65850.55, 66015, and 66016, and Health and Safety Code Section 17951. The city cannot condition approval on sign-off from a homeowners' association, and any restriction an HOA or the city imposes cannot add more than ten percent to the system's cost, or more than one thousand dollars for a photovoltaic system, without qualifying as an unreasonable restriction under Section 16.54.020.
Violations & Fines
The city cannot deny a small residential rooftop solar permit unless the building official makes written findings, backed by substantial evidence, that the installation would cause a specific, adverse impact on public health or safety with no feasible way to mitigate it, under Section 16.54.060(J). An applicant who disagrees with a denial or an added condition can appeal to the planning commission within ten days of the building official's decision, using the city's approved appeal form and paying the council's set appeal fee.
Frequently Asked Questions
What size solar system qualifies for Camarillo's expedited permit?
Can I apply for a Camarillo solar permit online?
Can my HOA block my solar panel installation?
What building codes must my solar system meet?
Sources & Official References
Other rules in Camarillo
California rules heatmap·Compare Camarillo to another location·View the California solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Panel Permits in Nearby Cities
How other cities in Ventura County handle panel permits.