Skip to main content
CityRuleLookup

Downey, CA Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Downey Municipal Code § 8150.08
Water heater certification
Accredited listing agency required
Electrical systems standard
California Electrical Code / UL listing
Application method
Email, internet, or fax accepted
Signature
Electronic signature accepted, no wet signature needed

Summary

Downey requires every solar energy system, from rooftop panels to pool heaters, to meet state health, safety, and listing standards before the Building and Safety Division will issue a permit, per Municipal Code § 8150.08. Applicants for small residential rooftop systems can submit electronically, and the City accepts electronic signatures in place of a wet signature on every form.

(c) Solar energy systems for producing electricity shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability. (d) The Building Official shall prepare a standard plan and submittal requirement checklist for small residential rooftop solar energy systems. Additionally, the Building Official shall prepare a submittal requirement checklist for all non-small residential rooftop solar energy systems. The standard plan and checklists shall be available to the public at the Building and Safety counter during normal business hours and on the City's website. (e) Applications for small residential rooftop solar energy system permit may be done through electronic submittal. (f) Electronic signature shall be deemed acceptable on all forms, applications, and other documents in lieu of a wet signature.

Full Breakdown

Section 8150.08 sets the substantive requirements behind Downey's solar permit process, separate from the expedited review timeline in § 8150.10. Every solar energy system installed in the city must meet the health and safety standards imposed by the State of California, Los Angeles County, and the City of Downey (§ 8150.08(a)). Systems that heat water for single-family homes, commercial buildings, or swimming pools must carry certification from an accredited listing agency recognized under the California Plumbing and Mechanical Code (§ 8150.08(b)). Systems that generate electricity must meet the safety and performance standards of the California Electrical Code, IEEE standards, and accredited testing labs such as Underwriters Laboratories, plus any applicable Public Utilities Commission safety and reliability rules (§ 8150.08(c)).

To standardize intake, the Building Official must prepare a standard plan and submittal checklist specifically for small residential rooftop systems, plus a separate checklist for larger, non-small systems; both must be posted at the Building and Safety counter and on the City's website (§ 8150.08(d)). Applicants for a small residential rooftop solar permit may submit their entire application through electronic submittal, defined by § 8150.06 as email, internet, or facsimile (§ 8150.08(e)). Electronic signatures are accepted in place of a wet signature on any form, application, or document tied to the permit (§ 8150.08(f)). These submittal rules work together with the three-business-day expedited review timeline in § 8150.10 to move rooftop solar permits through the Building and Safety Division without requiring an in-person visit.

Violations & Fines

A solar installation that skips the required listing certification or electrical safety standards in § 8150.08 will not clear Downey's plan check, and the Building Official can reject the submittal even on the expedited track. Applicants who submit an incomplete standard-plan checklist face the same written correction notice process used for other deficiencies, and work performed without the resulting permit is subject to the City's general Municipal Code enforcement and misdemeanor penalties.

Frequently Asked Questions

Can I submit my Downey solar permit application online?
Yes. Section 8150.08(e) lets applicants for a small residential rooftop solar energy system submit through electronic submittal, defined in § 8150.06 as email, internet, or facsimile. The City also accepts an electronic signature in place of a wet signature on every form in the application under § 8150.08(f).
Does my solar water heater need special certification?
Yes. Under § 8150.08(b), solar water heating systems for single-family homes, commercial buildings, or swimming pools must be certified by an accredited listing agency as defined by the California Plumbing and Mechanical Code before Downey will issue a permit.
Where can I get Downey's solar submittal checklist?
The Building Official is required by § 8150.08(d) to prepare a standard plan and submittal checklist for small residential rooftop systems, and a separate checklist for larger systems. Both must be available at the Building and Safety counter during normal hours and posted on the City's website.

Sources & Official References

Other rules in Downey

All Downey rules

California rules heatmap·Compare Downey to another location·View the California solar energy overview

Get notified when Panel Permits in Downey, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Los Angeles County handle panel permits.

Santa Clarita, CA
Light Restrictions
Santa Monica, CA
Light Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Carson, CA
Some Restrictions
Glendale, CA
Some Restrictions
Palmdale, CA
Some Restrictions