Paramount, CA Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Governing section
Paramount Municipal Code § 15.08.050
System size
Up to 10 kilowatts AC or 30 kilowatts thermal
Eligible buildings
Single- or duplex-family dwellings
Filing method
In person at the Building Department
Guidebook
California Solar Permitting Guidebook
AC disconnect
Within 3 feet of the meter, exterior (§ 15.04.013)

Summary

In the City of Paramount, California, a small residential rooftop solar system is one up to 10 kilowatts AC or 30 kilowatts thermal on a single- or duplex-family dwelling. The Building Department keeps the application documents, a standard plan and a checklist, and under § 15.08.050 the process follows the California Solar Permitting Guidebook.

A. All documents required for the submission of an expedited small residential rooftop solar energy system application shall be made available at the City's Building Department. B. The Building Department shall adopt a standard plan and checklist of all requirements with which small residential rooftop solar energy systems shall comply with to be eligible for expedited review. C. The small residential rooftop solar energy system permit process, standard plans, and checklist shall substantially conform to the recommendations for expedited permitting, including the checklist and standard contained in the most current version of the California Solar Permitting Guidebook adopted by the Governor's Office of Planning and Research. D. All fees prescribed for the permitting of small residential rooftop solar energy systems shall comply with Government Code Sections 65850.55 and 66015 and Health and Safety Code Section 17951.

Full Breakdown

Chapter 15.08 was adopted to create an expedited, streamlined solar permitting process that complies with the Solar Rights Act and AB 2188 (Chapter 521, Statutes 2014) for small residential rooftop systems. Under § 15.08.020, a small residential rooftop solar energy system is one not larger than 10 kilowatts alternating current nameplate rating or 30 kilowatts thermal, conforming to State fire, structural, electrical and other building codes as adopted or amended by the City, installed on a single- or duplex-family dwelling, with a panel or module array that does not exceed the maximum legal building height. The Building Department means the Building Division of the Planning Department.

Section 15.08.050 sets the paperwork. All documents required for an expedited application are available at the City's Building Department, which adopts a standard plan and checklist. The permit process, standard plans and checklist must substantially conform to the most current California Solar Permitting Guidebook adopted by the Governor's Office of Planning and Research, and permit fees must comply with Government Code Sections 65850.55 and 66015 and Health and Safety Code Section 17951.

Section 15.08.040 sets the technical standards. All systems must meet applicable health and safety standards imposed by the City and the State. Systems for heating water in single-family residences, and for commercial or swimming pool water heating, must be certified by an accredited listing agency as defined by the California Plumbing and Mechanical Code. Systems producing electricity must meet the California Electrical Code, the Institute of Electrical and Electronics Engineers standards and accredited testing laboratories such as Underwriters Laboratories, and Public Utilities Commission safety rules where applicable. The City's local electrical amendment in § 15.04.013(B) requires a single, visible-open, lockable AC disconnect within 3 feet of the meter on the exterior of the building.

Section 15.08.030 places older legally permitted systems outside the chapter unless physical changes materially alter size, type or components in a way that requires new permitting; routine operation and maintenance or like-kind replacements need no permit. Applications are filed in person at the Building Department under § 15.08.060(B).

Violations & Fines

Chapter 15.08 prints no fine of its own. Any violation of the Code, including the Building Code and Electrical Code that the chapter relies on, can draw an administrative citation under Chapter 1.08, with a fine from the Council's schedule. Except when a violation creates an immediate danger to health or safety, the cited party gets a reasonable period of time to correct a Building or Electrical Code violation before a fine is imposed (§ 1.08.050). Each day a violation exists is a separate offense.

Frequently Asked Questions

What size solar system qualifies for Paramount's expedited process?
Under § 15.08.020, a small residential rooftop solar energy system is not larger than 10 kilowatts alternating current nameplate rating or 30 kilowatts thermal, conforms to State fire, structural, electrical and other building codes, is installed on a single- or duplex-family dwelling, and has an array that does not exceed the maximum legal building height.
Where do I file a solar permit application in Paramount?
In person at the Building Department, which is the Building Division of the Planning Department. Section 15.08.060(B) says the City does not accept electronic submittal of solar energy system permit applications, including electronic signatures, until it accepts electronic submittal of all building permit applications. The Building Department makes the required documents available at its office under § 15.08.050(A).
Do I need a new permit to replace solar panels?
Section 15.08.030 says routine operation and maintenance or like-kind replacements do not require a permit. A physical modification that materially changes the size, type or components of a system in a way that requires new permitting does fall under the chapter. Systems legally established or permitted before the chapter took effect are otherwise outside it.
What disconnect does Paramount require for rooftop solar?
Section 15.04.013(B) amends Article 690.13(A) of the California Electrical Code. The PV disconnecting means must be at a readily accessible location, either on the outside of a building or structure or inside nearest the point of entrance of the system conductors, and a single, visible-open, lockable AC disconnect must be within 3 feet of the meter on the exterior of the building.

Sources & Official References

Other rules in Paramount

All Paramount rules

California rules heatmap·Compare Paramount to another location·View the California solar energy overview

Get notified when Panel Permits in Paramount, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Los Angeles County handle panel permits.

Santa Clarita, CA
Light Restrictions
Santa Monica, CA
Light Restrictions
Downey, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Carson, CA
Some Restrictions
Glendale, CA
Some Restrictions