Bossier Parish, LA Swimming Pools & Spas: Pool Permits (2026)
Swimming pool permit rules in Bossier Parish, LA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.
Key Facts
- Permit trigger
- Any pool 24+ inches deep
- Exempt
- Prefab pools under 24 inches deep
- Enforcing agency
- Bossier Parish Building Official
- Permit expires
- 180 days if work not started
- Fine
- $100 to $500 per offense
- Extra penalty
- 50% of unpaid permit fees
Summary
In unincorporated Bossier Parish, any residential swimming pool other than a prefabricated pool under 24 inches deep needs a building permit from the Bossier Parish Building Official before construction starts. The parish's general building-permit rule in Chapter 19 covers pools alongside other structures.
(a)Required. It shall be unlawful to construct, enlarge, alter, extensively alter, repair, move, demolish, or change the occupancy of any building or structure, or to erect, install, enlarge, alter, extensively alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the technical codes adopted in section 19-3, or to cause any such work to be done, without obtaining a properly issued permit from the Bossier Parish Building Official for that work ... (c)Building. ... (7)Prefabricated swimming pools that are less than 24 inches (610 mm) deep.
Full Breakdown
In unincorporated Bossier Parish, Chapter 19 of the parish code puts nearly all construction, including residential swimming pools, under one general permit rule. Section 19-5(a) makes it unlawful to construct, enlarge or alter any building or structure without a properly issued permit from the Bossier Parish Building Official, and pools fall inside that requirement because the only pool carved out under section 19-5(c)(7) is a prefabricated pool less than 24 inches deep. Anything bigger, including an in-ground pool or a deeper above-ground model, needs a permit before the first shovel goes in the ground.
The application must identify the work, describe the property, state the construction valuation and be accompanied by construction documents per section 19-6, including a site plan showing the pool's location and its distance from lot lines. Fees are set by the schedule adopted under section 19-8, and a permit becomes invalid if work does not start within 180 days of issuance or is abandoned for 180 days, though the Building Official can grant extensions on written request. The Building Official reviews the application, may reject it in writing with stated reasons, and issues the permit once satisfied the work conforms to the adopted construction codes. Pools built without a permit are subject to a stop-work order under section 19-13 and prosecution through the parish attorney under section 19-12.
Violations & Fines
Building without a permit is a misdemeanor under section 19-14, punishable by a fine of not less than $100.00 nor more than $500.00 per offense, and continuing work after a stop-work order carries the same $100.00 to $500.00 range under section 19-13(c). Section 19-12(e) adds that violators must still pay every fee the legal permit would have generated, plus a 50 percent penalty on top of those fees, regardless of how far construction has progressed.
Frequently Asked Questions
Do I need a permit for an above-ground pool in unincorporated Bossier Parish?
What happens if I build a pool without a permit?
How long is a Bossier Parish building permit valid before work has to start?
Does my pool need a site plan submitted with the permit application?
Sources & Official References
Other rules in Bossier Parish
Compare Bossier Parish to another location·View the Louisiana swimming pools & spas overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.