Swimming pool permit rules in Bossier Parish, LA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit trigger
Any pool 24+ inches deep
Exempt
Prefab pools under 24 inches deep
Enforcing agency
Bossier Parish Building Official
Permit expires
180 days if work not started
Fine
$100 to $500 per offense
Extra penalty
50% of unpaid permit fees

Summary

In unincorporated Bossier Parish, any residential swimming pool other than a prefabricated pool under 24 inches deep needs a building permit from the Bossier Parish Building Official before construction starts. The parish's general building-permit rule in Chapter 19 covers pools alongside other structures.

These county ordinances apply to unincorporated areas of Bossier Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)Required. It shall be unlawful to construct, enlarge, alter, extensively alter, repair, move, demolish, or change the occupancy of any building or structure, or to erect, install, enlarge, alter, extensively alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the technical codes adopted in section 19-3, or to cause any such work to be done, without obtaining a properly issued permit from the Bossier Parish Building Official for that work ... (c)Building. ... (7)Prefabricated swimming pools that are less than 24 inches (610 mm) deep.

Full Breakdown

In unincorporated Bossier Parish, Chapter 19 of the parish code puts nearly all construction, including residential swimming pools, under one general permit rule. Section 19-5(a) makes it unlawful to construct, enlarge or alter any building or structure without a properly issued permit from the Bossier Parish Building Official, and pools fall inside that requirement because the only pool carved out under section 19-5(c)(7) is a prefabricated pool less than 24 inches deep. Anything bigger, including an in-ground pool or a deeper above-ground model, needs a permit before the first shovel goes in the ground.

The application must identify the work, describe the property, state the construction valuation and be accompanied by construction documents per section 19-6, including a site plan showing the pool's location and its distance from lot lines. Fees are set by the schedule adopted under section 19-8, and a permit becomes invalid if work does not start within 180 days of issuance or is abandoned for 180 days, though the Building Official can grant extensions on written request. The Building Official reviews the application, may reject it in writing with stated reasons, and issues the permit once satisfied the work conforms to the adopted construction codes. Pools built without a permit are subject to a stop-work order under section 19-13 and prosecution through the parish attorney under section 19-12.

Violations & Fines

Building without a permit is a misdemeanor under section 19-14, punishable by a fine of not less than $100.00 nor more than $500.00 per offense, and continuing work after a stop-work order carries the same $100.00 to $500.00 range under section 19-13(c). Section 19-12(e) adds that violators must still pay every fee the legal permit would have generated, plus a 50 percent penalty on top of those fees, regardless of how far construction has progressed.

Frequently Asked Questions

Do I need a permit for an above-ground pool in unincorporated Bossier Parish?
Yes, unless it's a prefabricated pool less than 24 inches deep. Section 19-5(c)(7) is the only pool exemption in the parish's building code, so any deeper above-ground pool or any in-ground pool needs a permit from the Bossier Parish Building Official before you build it.
What happens if I build a pool without a permit?
You're subject to prosecution as a misdemeanor under section 19-14, with fines between $100.00 and $500.00 per offense, and section 19-12(e) also requires you to pay every permit and inspection fee you skipped plus a 50 percent penalty on top.
How long is a Bossier Parish building permit valid before work has to start?
Under section 19-5(p), a permit becomes invalid if the authorized work isn't started within 180 days of issuance, or if it's suspended or abandoned for 180 days after starting. The Building Official can grant written extensions of up to 180 days each for justifiable cause.
Does my pool need a site plan submitted with the permit application?
Yes. Section 19-6(e) requires the construction documents submitted with a permit application to include a site plan showing the size and location of the new construction, including distances from lot lines, so the Building Official can confirm placement before approving the pool.

Sources & Official References

Other rules in Bossier Parish

All Bossier Parish rules

Compare Bossier Parish to another location·View the Louisiana swimming pools & spas overview

Get notified when Pool Permits in Bossier Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.