Skip to main content
CityRuleLookup

Clifton, NJ Swimming Pools & Spas: Pool Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Swimming pool permit rules in Clifton, NJ, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit issuer
Building Inspector
Permanent pool sign-off
Plumbing Inspector and Board of Health
Annual permit fee
$5 per pool
Permit expiration
May 1 each year
Max pool surface area
25% of the yard
Maximum penalty
$200 fine or 90 days

Summary

No one may build, alter or maintain a private pool in Clifton without a Building Inspector permit. Permanent pools also need Plumbing Inspector and Board of Health sign-off, and every pool pays a $5 annual permit fee that expires each May 1.

§ 403-23. Permit required; conformity required. It shall be unlawful for any person to: A. Establish, construct or alter a private pool without first having obtained a permit therefor... B. Maintain a private pool which is not in conformity with the requirements of this article. § 403-24. A permit for a private pool shall be issued by the Building Inspector to the owner or agent of any residence property in the City... § 403-26. A. The following annual permit fees shall be paid... (1) For all pools: $5. B. Permits or renewals thereof shall expire on May 1 of each year.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4963532; v64 updated 2026-07-21; through 07-21-2026).

Full Breakdown

Clifton Code § 403-23 makes it unlawful to establish, construct or alter a private pool without first obtaining a permit, or to maintain a private pool that does not conform to the article's requirements. Under § 403-24, the Building Inspector issues the permit to the owner or agent of any residential property once the private-pool requirements are met. For a permanent pool specifically, § 403-25 requires the owner to apply to the Building Inspector with a set of plans and specifications and a plot plan, certified by a licensed surveyor or engineer, showing existing and proposed contour lines and the pool's proposed location; the Building Inspector may issue the permit only after the Plumbing Inspector and the Board of Health have approved it.

Section 403-26 fixes the annual fee for all pools at $5, as amended in 2009 by Ordinance No. 6788-09, with permits and renewals expiring on May 1 each year regardless of issuance date. Additional article requirements folded into the permit review include a ban on any physical connection between the pool's circulating system and a potable water supply (§ 403-27), a mandatory drain not exceeding six inches in diameter running to a brook, dry well or sewer for permanent pools built after May 26, 1960 (§ 403-28), and a zoning cap limiting a pool's water surface area to no more than 25% of the yard in which it sits, since pools are regulated as accessory buildings under the City's Zoning Ordinance (§ 403-29).

Lighting and electrical work tied to a pool must also be inspected and approved under the National Board of Fire Underwriters Code standards (§ 403-30B).

Violations & Fines

Anyone who violates the private-pool article, including building or maintaining a pool without the required permit, faces a fine of up to $200 or imprisonment up to 90 days, or both, under § 403-34A, with each day a violation continues counted as a separate offense. The penalty provision does not apply to a permit renewal unless the Building Department gave the permittee at least 10 days' written notice to renew and the permittee still failed to do so (§ 403-34B).

Frequently Asked Questions

Do I need a permit to build a residential pool in Clifton?
Yes. Clifton Code § 403-23 makes it unlawful to establish, construct or alter a private pool without first obtaining a permit from the Building Inspector, and § 403-24 confirms the Building Inspector issues it to the property owner or agent.
What does a permanent pool permit application require?
Under § 403-25, the application needs plans or a descriptive brochure plus a surveyor- or engineer-certified plot plan showing existing and proposed contour lines, and the pool must be approved by both the Plumbing Inspector and the Board of Health before the Building Inspector issues the permit.
How much is Clifton's pool permit fee and when does it expire?
The annual fee for all pools is $5 under § 403-26, and every permit or renewal expires on May 1 of each year regardless of when it was issued.

Sources & Official References

Other rules in Clifton

All Clifton rules

Compare Clifton to another location·View the New Jersey swimming pools & spas overview

Get notified when Pool Permits in Clifton, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Pool Permits in Nearby Cities

How other cities in Passaic County handle pool permits.

Paterson, NJ
Some Restrictions