Las Cruces, NM Swimming Pools & Spas: Pool Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Swimming pool permit rules in Las Cruces, NM, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Governing law
Land Development Code Div. 13 (§§30-556-30-565)
Enforcing agency
Community Development Department
Utility sign-off required
El Paso Electric approval before filing
Pipe pressure test
35 PSI for 15 minutes
Reinspection fee
$30.00 per visit
Work deadline
complete within one year of issuance

Summary

Building a residential swimming pool in Las Cruces requires a building permit under Land Development Code Division 13, Sec. 30-556 through Sec. 30-565. The Community Development Department reviews structural, plumbing and electrical plans, and written approval from El Paso Electric must be obtained before the permit is issued.

This division applies to all International Building Code occupancy groups. [Sec. 30-558(a)] Prior to submitting for a permit, approval from El Paso Electric shall be obtained. Building or work corresponding to each permit issued by the building official under the provisions of this Code shall commence within 180 days and be completed within one year from the date of permit issuance. [Sec. 30-561(c)(1)] Rough in. Shall be made after the circulating lines, pool drain, water distribution line, and gas line to boiler have been installed, and there shall be an air pressure test of 35 (PSI) for 15 minutes on the swimming pool piping before it is covered or concealed. [Sec. 30-564(a)] A $30.00 reinspection fee may be assessed for each inspection or reinspection whenever such portion of work is not complete, corrections called for are not made, or the building is not accessible.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 33 | Land Development Code: Supplement 28).

Full Breakdown

Division 13 of the Land Development Code (Sec. 30-556 to Sec. 30-565) governs new swimming pool construction and applies to every International Building Code occupancy group, covering residential backyard pools as well as commercial pools. Before applying, an owner may submit a conceptual plan to the Community Development Department at no charge; this pre-application step does not approve anything. To apply for the real permit, Sec. 30-558 requires prior written approval from El Paso Electric, then offers a plan-review track (city departments including fire and public works return findings within two business days) or an over-the-counter track unavailable in the University Avenue Corridor, Avenida de Mesilla Gateway, and Lohman Avenue overlay zones.

Sec. 30-559 lists the submittal package: a signed application with contractor license number, plan review fee, permit fee, and blueline construction drawings at one-quarter inch to one foot scale showing the pool's dimensions, required setbacks, fence or wall location, a mechanical plan for any heater and gas line, and an electrical load calculation approved by the public service company. Applications lapse after 180 days without a permit, and issued permits must start work within 180 days and finish within one year. Sec. 30-561 sets the technical inspections: a foundation/slab check before concrete is poured, an electrical grounding and conduit inspection, and a plumbing rough-in inspection that requires the pool piping to hold 35 PSI of air pressure for 15 minutes before it is covered.

00 reinspection fee under Sec. 30-564 applies whenever work is not ready, corrections are not made, or the site is inaccessible for a scheduled inspection. No pool may be used until the building official issues a Sec. 30-565 certificate of completion listing the permit number, owner, and compliance statement; that certificate can be suspended or revoked in writing if a violation is later found.

Violations & Fines

Using a pool before the building official signs off on a certificate of completion, or covering pool piping before it passes the 35 PSI pressure test, means the work has to be uncovered and reinspected. Missed or failed inspections trigger the $30.00 reinspection fee each time, and the building official can suspend a certificate of completion in writing if a code violation surfaces later.

Frequently Asked Questions

Does El Paso Electric have to approve my pool permit?
Yes. Sec. 30-558(a) requires written approval from El Paso Electric before the Community Development Department will accept a swimming pool permit application, on top of the standard plan review and fees.
What inspection does pool plumbing have to pass?
Sec. 30-561(c)(1) requires the circulating lines, drain, water distribution line and any gas line to the pool heater to hold an air pressure test of 35 PSI for 15 minutes before the piping can be covered or concealed, confirmed by a rough-in inspection.
How long do I have to finish pool construction once permitted?
Work must commence within 180 days of permit issuance and be completed within one year under Sec. 30-558(d). Missing that window means submitting new plans and paying a new permit fee to renew, and the building official can grant only one 180-day extension on request.

Sources & Official References

Other rules in Las Cruces

All Las Cruces rules

Compare Las Cruces to another location·View the New Mexico swimming pools & spas overview

Get notified when Pool Permits in Las Cruces, NM changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.