Swimming pool permit rules in Montebello, CA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit type
building permit, Ch. 15.04
Grading permit
exempt if under a building permit
Plan requirement
show fencing compliance before approval
Supervised grading trigger
excavation over 3 feet deep
Enforcement penalty
misdemeanor, up to $1,000/6 months

Summary

Building a residential swimming pool in the City of Montebello requires a valid building permit before excavation starts. Section 15.48.090 exempts pool excavation from the separate grading permit only because the pool itself is built under a building permit, and Section 15.04.090(B) requires the submitted pool plans to show compliance with the city's fencing rules before final approval.

B.All plans hereafter submitted to the city for swimming pools to be constructed shall show compliance with the requirements of this section, and final inspection and approval of all pools hereafter constructed shall be withheld until all requirements of this section shall have been complied with. ... 1.An excavation below finished grade for basements or footings for buildings, swimming pools, walls or other similar structures constructed pursuant to a valid building permit issued by the city; and2.Work on any public works project.

Full Breakdown

Montebello does not carry one section titled simply pool permits. Instead the requirement shows up from two directions that confirm each other. Section 15.48.090(A)(1), in the city's grading chapter, exempts an excavation below finished grade for basements or footings for buildings, swimming pools, walls or other similar structures from the separate grading permit, but only when that excavation is constructed pursuant to a valid building permit issued by the city, meaning the grading exemption exists precisely because pool construction already needs, and is expected to proceed under, a building permit.

Section 15.04.090(B), in the building code chapter, then confirms the permit process applies to pools specifically: all plans hereafter submitted to the city for swimming pools to be constructed shall show compliance with the requirements of this section, referring to the fencing standard, and final inspection and approval of all pools hereafter constructed shall be withheld until compliance is shown. Together the two sections establish that a pool builder must obtain a building permit, submit plans demonstrating the fence will meet the five-foot barrier and self-latching gate standard, and pass final inspection before the pool can be used.

If the excavation for the pool exceeds three feet in depth, encroaches on a public easement, or otherwise triggers the conditions in Section 15.48.070, a supervised grading permit under a civil engineer's oversight is layered on top of the building permit rather than substituting for it.

Violations & Fines

Excavating for or building a residential pool without the building permit required under Chapter 15.04, or without the supervised grading permit where Section 15.48.070's excavation conditions apply, is enforced under the citywide general penalty, Section 1.12.010, as a misdemeanor punishable by a fine of up to one thousand dollars, imprisonment of up to six months, or both, and final approval of the pool is withheld under Section 15.04.090(B) until the violation is cured.

Frequently Asked Questions

Do I need a permit to build a pool in Montebello?
Yes. Section 15.48.090(A)(1) exempts pool excavation from a separate grading permit specifically because it expects that excavation to be done pursuant to a valid building permit, and Section 15.04.090(B) requires your pool plans to be submitted to the city and approved before construction.
Does a pool also need a grading permit?
Only if the excavation triggers Section 15.48.070's conditions, such as exceeding three feet in depth or affecting drainage or a public easement, which calls for a supervised grading permit under a civil engineer in addition to the building permit.
What has to be in my pool building plans?
Section 15.04.090(B) requires the plans submitted for the pool to show compliance with the fencing requirements in that section, since final inspection and approval of the completed pool is withheld until the required fence and gate hardware are in place.
What if I build a pool without any permit?
It is a misdemeanor under the citywide general penalty, Section 1.12.010, punishable by a fine of up to one thousand dollars, up to six months in jail, or both, and the city will withhold final approval of the pool until the violation is corrected.

Sources & Official References

Other rules in Montebello

All Montebello rules

California rules heatmap·Compare Montebello to another location·View the California swimming pools & spas overview

Get notified when Pool Permits in Montebello, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Pool Permits in Nearby Cities

How other cities in Los Angeles County handle pool permits.

Carson, CA
Light Restrictions
Lancaster, CA
Some Restrictions
Altadena, CA
Some Restrictions
Downey, CA
Some Restrictions
Los Angeles, CA
Some Restrictions
Torrance, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Lakewood, CA
Some Restrictions