Bothell, WA Trash & Recycling: Dumpster Rules (2026)
Key Facts
- Retail storage space
- Ten square feet per 1,000 square feet of floor area
- Outdoor enclosure
- Seven-foot wall or fence with a gate
- Gate opening
- At least 12 feet wide
- Setbacks
- No outdoor collection points in required setbacks
- Container lids
- Maintained in a closed position
- Dumpster screening, BMC 12.18.100(B)
- Solid four-foot evergreen hedge, fence, or textured wall
Summary
In the City of Bothell, Washington, every development other than single-family residential must provide storage space for garbage and recyclables, sized per 1,000 square feet of floor area. Outdoor collection points stay out of required setbacks, sit inside a seven-foot wall or fence with a gate, stay out of view from the street, and keep container lids closed (BMC § 12.14.155).
All development other than single-family residential development shall provide storage space for the collection of recyclables and garbage as follows: ... C. The storage space for nonresidential development shall be apportioned and located in collection points as follows: ... 2. Outdoor collection points shall not be located in any required setback areas. ... 4. A seven-foot wall or fence with a gate or gates shall enclose any outdoor collection point, excluding collection points located in industrial developments that are greater than 100 feet from residentially zoned property and not visible from the street right-of-way. ... 7. No collection point or container shall be visible from the street right-of-way or adjacent single-family development. The collection point or container shall either be located behind the building or shall be adequately screened with Type I landscaping. ... F. No container shall be collected and stored at any location on the site except in a designated storage facility. G. The lids of all garbage and recyclables containers shall be maintained in a closed position.
Full Breakdown
BMC 12.14.155 sets the storage space rate: three square feet per dwelling unit in multifamily developments (unless the development takes part in a public agency-sponsored or approved direct collection program using individual recycling bins), four square feet per 1,000 square feet of gross floor area in office, educational and institutional developments, six square feet per 1,000 in manufacturing developments and all other developments, and ten square feet per 1,000 in retail developments.
Nonresidential developments can use a centralized collection point. Outdoor collection points cannot sit in any required setback area, and they must be placed so hauling trucks do not obstruct pedestrian or vehicle traffic or project into any public right-of-way. Access to collection points can be limited except during regular business hours and specified collection hours. Multifamily developments need at least one collection point for every 30 dwelling units, no more than 200 feet from a common entrance of a residential building.
Design standards come next. An enclosure or building holding a collection point must match the primary structure in architectural style, exterior finish materials and colors, and details. A seven-foot wall or fence with a gate encloses any outdoor collection point, with an exception for industrial developments more than 100 feet from residentially zoned property and not visible from the street right-of-way. Gate openings are at least 12 feet wide, with 12 feet of vertical clearance for roofed structures. Signs identifying a collection point cannot exceed two square feet each, and weather protection comes from weather-proof containers or a roof.
No container can be stored anywhere on the site except in a designated storage facility, only recyclable materials and garbage generated on the site can be stored there, and lids stay closed. BMC 12.18.100(B) adds that all garbage dumpsters and other refuse containers must be obscured from view from adjacent streets and properties with a solid four-foot evergreen hedge or a fence or textured wall supplemented with plantings a minimum of three feet in width.
Violations & Fines
BMC 12.14.155 sits in Title 12, so the community development director enforces it under Chapter 11.20 BMC. A notice of violation names the provision breached and the corrective action required. The civil penalty maximum under BMC 11.20.010 is $250.00 per day for each violation from the date set for compliance until compliance is achieved, and the city can also assess its investigation and correction costs. An appeal goes to the hearing examiner within 15 calendar days after service.
Frequently Asked Questions
How much dumpster space does a business in Bothell need?
Can a dumpster sit in a setback in the City of Bothell?
How must a dumpster enclosure be built?
How many collection points does an apartment complex need?
Sources & Official References
Other rules in Bothell
Compare Bothell to another location·View the Washington trash & recycling overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Dumpster Rules in Nearby Cities
How other cities in King County handle dumpster rules.