Garden Grove, CA Zoning Overlays & Bonuses: Downtown Design Guide (2026)
Key Facts
- Zone
- Applies to CC-2, Historic Main Street
- Design criteria
- Adopted by resolution, filed with Clerk
- Site plan
- Required for >10% floor area addition
- Review body
- Downtown Commission, then Planning Commission
- Rehab track
- Building design plan via Zoning Administrator
- Citation
- Municipal Code Sec. 9.18.090.050
Summary
Any exterior work on Main Street between Acacia Parkway and Garden Grove Boulevard, the city's CC-2 Historic Main Street zone, has to match architectural design criteria adopted by resolution under Municipal Code Section 9.18.090.050, and most projects need a site plan or building design plan reviewed by the Downtown Commission before the Community Development Department will approve it.
A. Purpose and Applicability. In addition to the other applicable requirements of this chapter, the provisions of this section apply to proposed development in the CC-2 zone. These standards are established to maintain the low-scale character and architectural style of development of the early-20th century district located along Main Street. ... 1. Architectural and Design Criteria. To ensure that the development, restoration, and revitalization of properties and buildings are completed in accordance with the general historical theme of the CC-2 zone, the Community Development Department shall adopt, by resolution, architectural and design criteria, which shall be filed in the office of the City Clerk. All development projects shall conform to such architectural and design criteria as though listed verbatim in this title. 2. Site Plan Required. Prior to the issuance of a building permit for any building or structure, a site plan shall be adopted if either of the following conditions apply: a. Floor area in excess of 10% will be added to an existing building or structure. b. A new building or structure will be established.
Full Breakdown
050 layers a historic-district design review process on top of Garden Grove's normal zoning review for any building used for nonresidential purposes, or for a mixed use building where residential space is less than two-thirds of the floor area, within the CC-2 zone along Main Street. 1 requires the Community Development Department to adopt architectural and design criteria by resolution, filed with the City Clerk, and every development project must conform to that criteria as though it were written into the zoning title itself, not treated as optional guidance.
A site plan is required before a building permit can issue whenever a project adds more than 10% to the floor area of an existing building, or whenever a new building or structure is proposed; that site plan goes first to the Downtown Commission for review and a recommendation, then to the Planning Commission for approval and architectural review. Where a structural rehabilitation is requested but a full site plan is not triggered, the code instead requires a building design plan, routed first to the Zoning Administrator for technical review, then to the Downtown Commission for review and recommendation, and finally to the Community Development Department for approval.
The Downtown Commission also has an ongoing compliance role: it monitors maintenance of CC-2 buildings, notifies owners and tenants of noncompliance, and can refer continued noncompliance to the Community Development Department, which is empowered to use any available means to secure compliance with the district's historical theme, including the building-painted-and-awnings-replaced maintenance standard the code sets for the zone.
Violations & Fines
Building or altering property in the CC-2 zone without the required site plan, building design plan, or in a manner that departs from the adopted architectural and design criteria is a Municipal Code violation. Under the citywide general penalty, Section 1.04.010, that is a misdemeanor punishable by up to a $1,000 fine and six months in county jail, or an infraction at the City Attorney's discretion, with each day of the violation a separate offense the Downtown Commission can refer for enforcement.
Frequently Asked Questions
Do I need approval to renovate a building on Main Street in Garden Grove?
Who approves design changes on Historic Main Street?
What happens if a Main Street building falls out of compliance with the design theme?
Sources & Official References
Other rules in Garden Grove
California rules heatmap·Compare Garden Grove to another location·View the California zoning overlays & bonuses overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Downtown Design Guide in Nearby Cities
How other cities in Orange County handle downtown design guide.