Beaumont, CA Accessory Structures: ADU Impact Fees (2026)
Key Facts
- JADU impact fee
- None imposed
- ADU under 750 square feet
- No impact fees imposed
- ADU of 750 square feet or more
- Impact fee proportionate to primary unit floor area
- Water and sewer connection charges
- Not counted as impact fees; charged separately
- Payment timing
- All applicable fees before building permit issuance
- Review deadline
- 60 days from a complete application
Summary
In the City of Beaumont, California, no impact fees apply to a JADU or to an ADU under 750 square feet. Larger ADUs pay impact fees in proportion to the primary dwelling's floor area. Water and sewer connection fees and capacity charges are separate from impact fees, and all applicable fees are due before the building permit issues.
C.Impact and Utility Fees. Prior to issuance of a building permit for an ADU or JADU, the applicant shall pay all applicable fees.1.No impact fees shall be imposed on a JADU or an ADU less than 750 square feet in size.2.Impact fees charged for ADUs greater than or equal to 750 square feet shall be charged proportionately in relation to the square footage of the primary unit (e.g., the floor area of the ADU, divided by the floor area of the primary dwelling, times the typical fee amount charged for a new dwelling).3.For the purposes of this section, "impact fee" means a "fee" as defined in Government Code Section 66000(b) and a fee specified in Government Code Section 66477. Impact fees do not include any connection fee or capacity charge for water or sewer service. ... 5.Installation of a separate direct connection between an ADU or JADU contained within an existing structure and the utility shall not be required.
Full Breakdown
Section 17.15.040 of the Beaumont Municipal Code governs how ADUs and JADUs are permitted and charged in Beaumont, Riverside County. Subsection A requires plot plan approval by the Community Development Director plus a building permit, and subsection B requires the City to act within 60 days of a complete application. The fee rules sit in subsection C, titled Impact and Utility Fees, and they apply before the building permit is issued: the applicant must pay all applicable fees first.
The first tier is a full exemption. Under C.1, no impact fees are imposed on a JADU or on an ADU less than 750 square feet in size. The second tier is a proportional charge. Under C.2, an ADU of 750 square feet or more is charged in relation to the square footage of the primary unit, using the code's own formula: the floor area of the ADU, divided by the floor area of the primary dwelling, times the typical fee amount charged for a new dwelling. A 900 square foot ADU behind a 2,700 square foot house, for example, carries one third of the new-dwelling fee under that formula.
Subsection C.3 defines the term. An impact fee means a fee as defined in Government Code Section 66000(b) and a fee specified in Government Code Section 66477, and it does not include any connection fee or capacity charge for water or sewer service. That carve-out matters because utility charges are handled separately. Under C.4, an ADU or JADU built with a new single-family home needs its own utility connection directly to the utility and pays the normal connection fee and capacity charge for a new dwelling. Under C.5, an ADU or JADU contained within an existing structure does not have to install a separate direct connection. An ADU that is not within an existing structure must install a new or separate utility connection and be charged a connection fee and, or, capacity charge, proportionate to the burden the ADU puts on the water or sewer system based on its size or number of plumbing fixtures, as determined by the City. Chapter 17.15 prints no dollar amounts, so the fee schedule adopted elsewhere by the City sets the figures.
Violations & Fines
Section 17.15.040.C makes payment of all applicable fees a condition that must be met before a building permit issues for an ADU or JADU, so unpaid fees stop the permit. Chapter 17.15 prints no separate penalty amount for fee violations. Section 17.15.050.L also pulls exemptions, such as reduced or exempt fees, back to current standards if an ADU is removed or converted to another use after a certificate of occupancy.
Frequently Asked Questions
Does Beaumont charge impact fees on a small ADU?
How are impact fees calculated for an ADU of 750 square feet or more?
Do I need a separate water or sewer connection for my Beaumont ADU?
When do I have to pay ADU fees in Beaumont?
Sources & Official References
Other rules in Beaumont
California rules heatmap·Compare Beaumont to another location·View the California accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
ADU Impact Fees in Nearby Cities
How other cities in Riverside County handle adu impact fees.