Arcadia, CA Building Safety: Building Permits (2026)
Key Facts
- Adopted code
- 2025 California Building Code with Chapter 1 and Appendix J
- Shed exemption floor area
- 120 square feet or less
- Shed exemption roof height
- 8 feet, 6 inches or less above adjacent grade
- Rebuild trigger
- More than 50% of exterior walls removed
- Permit fees
- Set by City Council resolution, plus a refuse fee
- Appeal deadline
- 30 days from the written decision
- Penalty
- Misdemeanor or infraction under Section 1200
Summary
In the City of Arcadia, California, building work falls under the 2025 California Building Code with Chapter 1 and Appendix J, and the City Council rewrote the permit exemption for sheds. A one-story detached tool shed or playhouse is exempt only at 120 square feet of floor area or less and a roof peak no higher than 8 feet, 6 inches above adjacent grade.
Chapter 1, Section [A] 105.2, Building, item number 1 of the 2025 California Building Code is amended to read as follows: 1.One-story detached accessory buildings used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 120 square feet and the highest point of the roof does not exceed 8 feet, 6 inches above adjacent grade. ... [A]109.2 General. Fees shall be assessed in accordance with the fee schedule set forth by resolution of the City Council. ... REBUILD as applied to an existing building, is where more than fifty percent (50%) of the exterior walls of a building are removed. Existing buildings that are classified as a rebuild shall comply with all current City zoning, building and fire regulations and pay building permit fees for a new structure.
Full Breakdown
The City Council adopts the 2025 California Building Code, Part 2 of Title 24, together with Chapter 1 and Appendix J based on the 2024 International Building Code, as the building regulations of the City of Arcadia (§ 8110). One copy sits in the office of the Building Official for public examination. Section 8130.3 amends item number 1 of Section 105.2 in Chapter 1, so the exemption covers only one-story detached accessory buildings used as tool and storage sheds, playhouses and similar uses, with a floor area of 120 square feet or less and a highest roof point of 8 feet, 6 inches or less above adjacent grade. A shed above either limit is outside this exemption.
Permit fees are assessed under the fee schedule the City Council sets by resolution (§ 8130.4), and every permit fee authorized under Article VIII carries an added refuse fee in an amount established by resolution (§ 8020.8). Section 8130.5 adds two definitions that decide how much compliance a project draws. A rebuild is where more than fifty percent (50%) of the exterior walls of a building are removed, and it must comply with all current City zoning, building and fire regulations and pay building permit fees for a new structure. A remodel is an alteration where not more than fifty percent (50%) of the exterior walls are removed.
Two other local amendments touch permitted sites. Section 8130.29 adds Section 3302.4, which calls for a six (6) foot tall construction fence with approved privacy screening on construction sites as required by the Building Official, located on private property and maintained for the duration of the project. Section 8130.1 adds Section 116.6, under which attractive nuisances, including unprotected and hazardous ponds, pools or excavations and buildings undergoing demolition, repair, rehabilitation or construction, are fenced or otherwise secured when required by the Building Official.
Appeals of Building Official or Fire Chief decisions go to the Planning Commission, which sits as the Arcadia Building and Fire Code Board of Appeals, and must be filed within 30 days of the written decision (§ 8130.2). A Planning Commission decision can be appealed to the City Council within five (5) working days, and the Council's decision is final.
Violations & Fines
Under § 8030, no person shall erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy or maintain any building or structure, or fixture attached to it, in violation of the codes adopted in Article VIII. Any such violation is a misdemeanor or infraction punishable pursuant to Section 1200 of the Arcadia Municipal Code. The Planning Commission does not hear an appeal until the Building Official or Fire Chief has issued a written decision.
Frequently Asked Questions
Do I need a building permit for a backyard shed in the City of Arcadia?
What is a rebuild under the Arcadia building code?
Who sets building permit fees in the City of Arcadia?
How do I appeal a Building Official decision in the City of Arcadia?
Sources & Official References
Other rules in Arcadia
California rules heatmap·Compare Arcadia to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Los Angeles County handle building permits.