Key Facts
- Exempt IRC shed
- 200 square feet floor area, 12 feet high
- Exempt IBC shed
- 120 square feet, 12 feet high, no vehicle storage
- Exempt fence
- Not over six feet high
- Exempt retaining wall
- Not over four feet, footing bottom to wall top
- Exempt deck
- Not more than 30 inches above grade
- Contractor details required
- Projects costing more than $5,000
- Fee refund
- Up to 80 percent, written request within 180 days
Summary
In the City of Bothell, Washington, any owner or authorized agent who plans to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure must apply to the building official and obtain a permit first. Bothell Municipal Code § 20.02.095 also lists the work that needs no permit, such as fences not over six feet high.
A. Required. ... Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. ... (2) One-story detached IBC accessory structures used as tool and storage sheds, but not including vehicle storage, provided the floor area does not exceed 120 square feet and the height does not exceed 12 feet from the grade plane to the highest point of the roof; b. Fences not over six feet (1,829 mm) high; ... f. Sidewalks, decks, and driveways, associated with residential structures constructed under the provisions of the IRC, not more than 30 inches (762 mm) above grade and not over any basement or story below and which are not part of an accessible route;
Full Breakdown
Under Bothell Municipal Code § 20.02.095(A), the permit duty reaches past the building itself. Installing, altering, repairing, removing, converting or replacing any electrical, gas, mechanical or plumbing system regulated by the code also requires an application to the building official first. The City of Bothell building department, headed by the building official under § 20.02.085, receives applications, reviews construction documents and issues the permits.
Subsection B lists what is exempt. A one-story detached residential accessory structure built under the IRC, such as a tool shed, playhouse or tree-supported play structure, is exempt up to 200 square feet of floor area, and the height above grade plane cannot exceed 12 feet except for tree-supported play structures. A one-story detached IBC accessory shed, not including vehicle storage, is exempt up to 120 square feet and 12 feet in height. Fences not over six feet high are exempt, as are retaining walls not over four feet measured from the bottom of the footing to the top of the wall, unless they support a surcharge or impound Class I, II or III-A liquids. Residential sidewalks, decks and driveways are exempt when not more than 30 inches above grade, not over any basement or story below, and not part of an accessible route. Finish work like painting, tiling, carpeting and cabinets is exempt, and so are prefabricated pools less than 24 inches deep holding no more than 5,000 gallons and installed entirely above ground. The subsection also exempts in-kind reroofing of one- and two-family dwellings when roof sheathing is not removed or replaced. An exemption never authorizes work that breaks any other provision of the code.
The application itself must follow § 20.02.110: a written form identifying the work, the land, the use, the valuation and the owner. For projects costing more than $5,000, it must add the prime contractor's name, address, phone and state registration number plus lender or payment bond details. Emergency equipment repairs need an application by the next working business day under § 20.02.100.
Violations & Fines
Starting work on a building, structure, gas, mechanical or plumbing system before getting the permits triggers the special investigation fee under Bothell Municipal Code §§ 20.02.155(F) and 20.02.161. For work without a valid permit, the fee is a permit fee equal to the original permit fee or at least three times the current hourly rate charged for the city inspector, whichever is greater. A permit is not valid until its fees are paid.
Frequently Asked Questions
Do I need a permit for a backyard shed in the City of Bothell?
Is a fence exempt from a Bothell building permit?
What happens if I build first and apply later in Bothell?
Can I get money back if I cancel a permit?
Sources & Official References
Other rules in Bothell
Compare Bothell to another location·View the Washington building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in King County handle building permits.