Key Facts
- Governing section
- BRC § 10-5-2(j), IBC § 105.2
- Adopted code
- 2024 International Building Code
- Exempt accessory building
- ≤120 sq ft, ≤10 ft, no utilities
- Exempt fence height
- Up to 7 feet
- Exempt deck
- ≤200 sq ft, ≤30 in above grade
- Permit expiration
- Voids after 180 days no work started
- Max project window
- 3 years from issuance to occupancy
Summary
Boulder requires a building permit for construction, alteration, and repair work under BRC 10-5-2, which adopts the 2024 International Building Code. Section 105.2 lists narrow exemptions, small accessory buildings, low fences, shallow retaining walls, minor decks, but everything else needs a permit from Planning & Development Services before work begins, and an exemption never excuses violating any other part of the code.
105.2 Work exempt from permit. Exemptions from the building permit requirements of this code do not grant authorization for any work to be done in violation of the requirements of this code or any other laws or ordinances of the city. Building permits shall not be required for the following: General:1.One-story detached nonconditioned buildings accessory to a residential structure and not more than 120 square feet in area or ten feet in height and not being served by any electrical, mechanical, or plumbing fixtures or systems.2.Fences not over 7 feet (2,134 mm) high.3.Retaining walls which are not over 3 feet in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II, or III-A flammable liquids...12.Decks accessory to single-family homes or townhomes, not exceeding 200 square feet in area, that are not more than 30 inches above grade at any point, are not attached to a dwelling and do not serve the exit door required by Section R311.4 of the IRC.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 167 Update 3).
Full Breakdown
BRC 10-5-2 adopts the 2024 International Building Code by reference as the City of Boulder Building Code, with local amendments layered on top of the base IBC text. 2, 'Work exempt from permit,' as repealed and reenacted by 10-5-2(j), spells out that exemptions from the permit requirement do not authorize any work done in violation of the code or other city ordinances, then lists what does not need a permit: one-story detached, non-conditioned accessory buildings of 120 square feet or less and no taller than ten feet with no electrical, mechanical, or plumbing service; fences no more than 7 feet high; retaining walls no more than 3 feet from footing to top unless they hold back a surcharge or Class I-III-A flammable liquids; walks and driveways no more than 30 inches above grade; finish work like painting and flooring; small prefabricated pools under 5,000 gallons and less than 24 inches deep; and single-family or townhome decks of 200 square feet or less that sit no more than 30 inches above grade, aren't attached to the dwelling, and don't serve a required exit door.
Everything outside that list, additions, new construction, garages over 120 square feet, structural alterations, needs a permit. Under 10-5-2(k), no permit can issue until every applicable city or Boulder County department signs off, including building, flood control, utilities, health, fire, engineering, zoning, planning, parks, and the city clerk. Applications go stale after 180 days without action (10-5-2(l)), and issued permits expire if work doesn't start within 180 days or stalls for 180 days (10-5-2(m)), with a hard three-year cap from issuance to occupancy approval.
Violations & Fines
Building, altering, or occupying a structure without the required permit violates Section 114 of the adopted code (10-5-2(r)); each day the illegal work or occupancy continues is a separate offense. The city manager can impose a $150 civil penalty for a first violation, $300 for a second, and $1,000 for a third of the same provision, plus a $250 fee for any investigative inspection tied to the violation, on top of criminal prosecution in municipal court.
Frequently Asked Questions
Do I need a permit to build a shed in my Boulder backyard?
How long is a Boulder building permit good for?
Can I get a Boulder building permit if the fire department hasn't signed off?
Sources & Official References
Other rules in Boulder
Compare Boulder to another location·View the Colorado building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Boulder County handle building permits.