Burlington, WI Building Safety: Building Permits (2026)
Key Facts
- Governing section
- City Code § 115-9(A)
- Permit categories
- 9 listed, incl. building, moving, occupancy
- Survey age limit
- No more than 1 year old
- Building permit expiration
- 4 months to start, 60-day gap limit
- New dwelling permit expiration
- 24 months if exterior incomplete
- Working before permit issues
- Fee doubled under § 115-25
Summary
Burlington requires a Building Inspector permit before any structure is built, enlarged, altered, demolished, or moved, covering nine specific categories from building work to occupancy and reroofing. Starting work early doubles the fee, and a residential application needs a certified survey and full plan set.
No building or structure, or any part thereof, shall hereafter be built, enlarged, altered or demolished within the City or moved into, within or out of the City except as hereinafter provided, unless a permit therefor shall first be obtained by the owner or his agent from the Building Inspector. Permits required are as follows: Building. ... Air conditioning. ... Wrecking or razing. ... Heating. ... Moving of buildings. ... Occupancy. ... Reroofing and re-siding. ... Fire inspection.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4997580; v29 updated 2026-07-07; through 07-07-2026).
Full Breakdown
Section 115-9(A) of the City Code bars building or moving any structure, or any part of one, within, into, or out of the City unless the owner or agent first obtains a permit from the Building Inspector. The section lists nine permit categories: building, air conditioning, wrecking or razing, heating, moving of buildings, occupancy, reroofing and re-siding, fire inspection, and any other permit the City requires or lists in its Fee Schedule. Subsection B requires the written application to name the owner of the building and of the land, the designer, the legal description, and the location, and to include two complete sets of plans and specifications plus two copies of a survey.
That survey cannot be more than one year old and must show every building's location and dimensions, lot dimensions, all setbacks, proposed and existing grades, corner monuments, watercourses, and the surveyor's seal. A complete residential plan set must include elevations, floor plans, full construction details, fireplace cross-sections, garage plans or a marked future garage location, and a grading plan. Section 115-10 posts the permit at the job site and voids it if work does not start within four months or is suspended more than 60 days, while a new-dwelling permit expires after 24 months if the exterior is not finished; the Building Inspector can extend either deadline for delays beyond the applicant's control. Section 115-25 separately makes it unlawful to start work before the permit issues and doubles the fee for anyone who does, except in emergencies.
Violations & Fines
Section 115-26 sends any violation of the building code chapter, including working without a permit, to the Chapter 1, § 1-4 general penalty: $5 to $500 for a first offense and $10 to $1,000 for a repeat within a year, both plus prosecution costs. Section 115-25 separately doubles the permit fee for work begun before a permit issues, on top of any § 1-4 forfeiture, and § 115-24 treats each day a code violation continues as a separate offense.
Frequently Asked Questions
What kinds of work need a permit in Burlington, Wisconsin?
What documents does a Burlington building permit application need?
How long is a Burlington building permit valid?
Sources & Official References
Other rules in Burlington
Compare Burlington to another location·View the Wisconsin building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.