Burlington, WI Building Safety: Electrical Permits (2026)
Key Facts
- Permit issuer
- Electrical Inspector
- Exempt work
- Maintenance repairs, no circuit changes
- Inspection window
- Within 48 hours of notice
- Correction period
- 10 days to fix hazards
- Adopted code
- Wis. Adm. Code Ch. Comm 16
Summary
Burlington's Electrical Inspector must issue a permit before any electrical installation for light, heat, or power begins, and the work needs both a permit and a licensed electrician. City Code § 142-5 waives a permit only for maintenance repairs that add no new circuit alterations.
A. Issuance. The Electrical Inspector shall issue permits for the execution of electrical installations for light, heat or power upon the filing of a proper application, which shall be made on forms furnished by the Inspector and shall prescribe the nature of the work as well as such other information as may be required for inspection. In no case shall any electrical work be done unless a permit and proper electrical license have been obtained. ... B. Exemptions. No permit shall be required for repairs made necessary for proper maintenance of an existing installation; however, no alterations or extensions of an existing circuit shall be made without a permit. In such cases the work may be complete and inspection may follow such completion.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4997580; v29 updated 2026-07-07; through 07-07-2026).
Full Breakdown
Under City Code § 142-5, the Electrical Inspector issues permits for electrical installations for light, heat, or power once an applicant files a proper application on the Inspector's forms describing the work. ' The only exemption covers repairs necessary for the proper maintenance of an existing installation; any alteration or extension of an existing circuit still needs a permit, though in maintenance cases the work can be completed before inspection follows. Permit fees are set in the Common Council's Fee Schedule. Once wiring is complete, or before it is concealed from view, § 142-7 requires the installer to notify the Electrical Inspector in writing, who then has 48 hours to inspect; if the work is fully compliant and not a hazard, the Inspector approves it and authorizes concealment, but if it is incomplete or noncompliant, the Inspector orders the hazards removed and changes made within 10 days.
No electric current may be turned on for a new installation until the Electrical Inspector issues a certificate of inspection. Construction itself must conform to Ch. Comm 16, Electrical, of the Wisconsin Administrative Code under § 142-6. Only a licensed electrical contractor, master electrician, or supervised apprentice or helper may perform the work, and the Electrical Inspector can order service disconnected for wiring found dangerous or unsafe under § 142-1.
Violations & Fines
Doing electrical work without a permit, concealing wiring before inspection, or ignoring a stop-work order violates Ch. 142 and is enforced by the Electrical Inspector, who may cut power to unsafe equipment. Violators face the City's general penalty under § 142-8 and § 1-4: a $5 to $500 forfeiture for a first offense, and the Electrical Inspector may also revoke the license involved.
Frequently Asked Questions
Do I need a permit for electrical work in Burlington?
How fast will the City inspect new wiring?
Can the City shut off my power for bad wiring?
Sources & Official References
Other rules in Burlington
Compare Burlington to another location·View the Wisconsin building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.