Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required for
construction, alteration, demolition, occupancy change
Also covers
electrical, gas, mechanical, plumbing systems
Permit validity
work must start within 180 days
Extension
one 180-day extension, written request required
No permit plus contractor
presumption of willful violation
Issuing officer
the building official
Governing law
Fayette County Code §§ 102-192, 102-196

Summary

Anyone who wants to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure in unincorporated Fayette County, or install regulated electrical, gas, mechanical or plumbing systems, must first apply to the building official and get a permit under Code § 102-192. A permit expires if work doesn't start within 180 days.

These county ordinances apply to unincorporated areas of Fayette County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the building code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit. If a licensed contractor performs construction without obtaining any necessary permit, there is a rebuttable presumption that the contractor willfully and deliberately violated the building laws of this jurisdiction. ... Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced.

Full Breakdown

Fayette County Code § 102-192 sets the baseline rule for the county's Department of Building Safety, formally the department of permits and inspections: before an owner or authorized agent starts construction, enlargement, alteration, repair, moving, demolition, or a change of occupancy of a building or structure, or before installing, altering or replacing an electrical, gas, mechanical or plumbing system regulated by the building code, the owner or agent has to file an application with the building official and obtain the permit. If a licensed contractor does the work anyway without pulling the required permit, the code creates a rebuttable presumption that the contractor willfully and deliberately violated the county's building laws, shifting the burden onto the contractor to explain the lapse.

Once issued, a permit does not last indefinitely. Code § 102-196 makes a permit invalid if the authorized work is not commenced within 180 days of issuance, or if work that has started is then suspended or abandoned for 180 days; a minimum of one approved inspection is required as proof that work began or continued. The building official can grant one 180-day extension, but only if the applicant requests it in writing with justifiable cause before the permit expires and no changes have been made to the approved plans; no permit can be extended more than once, and an extension costs half the fee of a new permit for that work.

Violations & Fines

Starting regulated work without a permit exposes the owner or contractor to a rebuttable presumption of a willful, deliberate violation of the county's building laws (Code § 102-192). The building official can also suspend or revoke a permit issued in error or based on incomplete or inaccurate information, and an investigation is required before any permit can later be issued for work already started without one (Code §§ 102-197, 102-201).

Frequently Asked Questions

Do I need a permit to build or remodel in unincorporated Fayette County?
Yes. Fayette County Code § 102-192 requires anyone who wants to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building, or install regulated electrical, gas, mechanical or plumbing systems, to first apply to the building official and obtain a permit before starting the work.
How long is a Fayette County building permit valid?
Code § 102-196 voids a permit if the authorized work is not commenced within 180 days of issuance, or if started work is suspended or abandoned for 180 days. The building official can grant one written extension of up to 180 more days for justifiable cause, but never more than one extension.
What happens if a contractor builds without a permit in Fayette County?
Code § 102-192 creates a rebuttable presumption that a licensed contractor who performs construction without first obtaining the required permit willfully and deliberately violated the county's building laws. The building official can also require a special investigation before issuing a permit for work already started without one.

Sources & Official References

Other rules in Fayette County

All Fayette County rules

Compare Fayette County to another location·View the Georgia building safety overview

Get notified when Building Permits in Fayette County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.