Howard County, IN Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Cost over $100
Permitting official
County Building Commissioner
Exempt work
Painting, cosmetic repairs
Minimum fee
$5 (costs up to $5,000)
Appeal path
Board of Appeals, then state council
Max penalty
$2,500 per day (§ 10.99)

Summary

Howard County Code § 150.05 requires a permit from the Building Commissioner before any construction, alteration, extension, or plumbing, electrical, heating, ventilation or air conditioning work with a cost over $100 begins in the unincorporated county, though painting and cosmetic repairs are exempt.

These county ordinances apply to unincorporated areas of Howard County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A) Prior to the construction of any building, structure, dwelling or any part thereof, no extension, repair or alteration of any existing building, no plumbing, no electrical work, no heating work, no ventilation work, nor air conditioning work having a contract price or estimated cost of more than $100 shall be started until a statement in writing of the work proposed to be done shall first be submitted by the contractor or individual in charge of the work to and approved by the Building Commissioner, and a permit issued by him or her for the proposed construction, alteration, repair or extension work. ... (D) No permit shall be required for any outside or inside painting or other cosmetic repair or maintenance where the building is not altered or extended.

Full Breakdown

05(A) is the general permit trigger for Howard County's building code: before construction of any building, structure or dwelling, or any extension, repair or alteration of an existing one, and before plumbing, electrical, heating, ventilation or air conditioning work with a contract price or estimated cost of more than $100, the contractor or person in charge must submit a written statement of the proposed work to the Building Commissioner and get a permit approved before starting. 02 backs this up by making it unlawful for any owner, lessee or occupant to erect, construct, enlarge, alter, repair, remove, convert, demolish, equip, use, occupy or maintain a building or structure, other than a fence, out of conformance with the chapter.

The Commissioner can require detailed plans and specifications, must keep a copy on file, and must approve any change before it is made; the Commissioner must refuse a permit outright if the proposed work would violate a state statute or county ordinance. 05(D) exempts outside or inside painting and other cosmetic repair or maintenance that does not alter or extend the building. 50 per required inspection. 07.

Violations & Fines

Starting covered construction, alteration or utility work without the Building Commissioner's approved permit violates §§ 150.02 and 150.05, punishable under the county's general penalty section, § 10.99, by a fine of up to $2,500 with each day of continued violation a separate offense; the Commissioner can also issue a stop-work order under § 150.08 to halt the job.

Frequently Asked Questions

When does Howard County require a building permit?
Section 150.05(A) requires a Building Commissioner permit before starting construction, alteration, or any plumbing, electrical, heating, ventilation or air conditioning work with a contract price or estimated cost of more than $100 anywhere in unincorporated Howard County, and the permit must be approved before work begins.
Is painting exempt from Howard County's building permit rule?
Yes. Section 150.05(D) exempts outside or inside painting and other cosmetic repair or maintenance work, as long as the building itself is not being altered or extended in the process, so no separate Building Commissioner permit is needed for that limited category of work.
Can I appeal a denied Howard County building permit?
Yes. Section 150.07 lets any applicant appeal the Building Commissioner's decision first to the county's Board of Appeals, appointed by the Board of County Commissioners, and from there to the Executive Committee of the Administrative Building Council of Indiana, though the code's own editor's note flags that underlying state statute as since repealed.

Sources & Official References

Other rules in Howard County

All Howard County rules

Compare Howard County to another location·View the Indiana building safety overview

Get notified when Building Permits in Howard County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.