Howard County, IN Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 1978 National Electrical Code
- Permit threshold
- Contract/cost over $100
- Permitting official
- County Building Commissioner
- Minimum permit fee
- $5 (costs up to $5,000)
- Inspection fee
- $7.50 per inspection
- Max penalty
- $2,500 per day (§ 10.99)
Summary
Howard County adopted the 1978 National Electrical Code by reference under § 150.03(A)(3), and § 150.05 makes it unlawful to start any electrical work with a contract price or estimated cost over $100 without first getting the Building Commissioner's approval and a permit.
(3) The National Electrical Code, 1978 edition, adopted by the National Fire Protection Association. ... (A) Prior to the construction of any building, structure, dwelling or any part thereof, no extension, repair or alteration of any existing building, no plumbing, no electrical work, no heating work, no ventilation work, nor air conditioning work having a contract price or estimated cost of more than $100 shall be started until a statement in writing of the work proposed to be done shall first be submitted by the contractor or individual in charge of the work to and approved by the Building Commissioner, and a permit issued by him or her for the proposed construction, alteration, repair or extension work.
Full Breakdown
03(A)(3) adopts the National Electrical Code, 1978 edition, by reference as the wiring standard governing construction in the county, alongside the Indiana Construction Rules and Regulations, the One- and Two-Family Dwelling Code, the Plumbing Rules and Regulations and the Mechanical Rules and Regulations; copies of all five are on file with the County Building Commission at the Courthouse. 05(A) requires that before any electrical work with a contract price or estimated cost over $100 begins, the contractor or person in charge must submit a written statement of the proposed work and get it approved by the Building Commissioner, who issues the permit.
The Commissioner can require detailed plans and specifications, keeps a copy on file, and must approve any change from those plans before the change is made; the Commissioner must refuse a permit if the proposed work would violate any state statute or county ordinance. 50 fee for each required inspection. No permit is needed for painting or other cosmetic work that does not alter or extend the building. C. 5, to the Executive Committee of the Administrative Building Council of Indiana, a statute the code's own editor's note flags as since repealed.
Violations & Fines
Starting electrical work costing more than $100 without an approved Building Commissioner's permit violates § 150.02 and § 150.05, punishable under the county's general penalty section, § 10.99, by a fine of up to $2,500, with each day the violation continues counted as a separate offense. The Commissioner may also issue a stop-work order under § 150.08 halting the job until the violation is corrected.
Frequently Asked Questions
Does Howard County require a permit for electrical work?
How much does an electrical permit cost in Howard County?
What happens if I do electrical work without a permit in unincorporated Howard County?
Sources & Official References
Other rules in Howard County
Compare Howard County to another location·View the Indiana building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.