Margate, FL Building Safety: Building Permits (2026)
Key Facts
- Permit exemption
- Repairs under $1,500.00 with no occupancy change
- Building code adopted
- 2007 Florida Building Code and future amendments
- Who can apply
- Certificate of competency holders only, Sec. 9-4
- Construction hours
- No equipment 7:00 p.m. to 7:00 a.m., Sundays, federal holidays
- Pool permit bond
- $500.00 cash bond from pool contractor
- Refund window
- Within six months, work not started
Summary
In the City of Margate, Florida, permit applications are accepted only from qualified persons or firms under Code § 9-4, and the Florida Building Code is adopted as the minimum standard. No permit is required for maintenance or repairs that do not change occupancy and cost less than $1,500.00 in labor and materials, as determined by the building official.
Applications for permit will only be accepted from qualified persons or firms as set forth in section 9-4. ... The 2007 edition of the Florida Building Code, and all future amendments thereto, and any successor code, and the Broward County Administration Section 100, are hereby adopted as the minimum building requirements for the city and said code is made a part hereof as if set out herein verbatim. ... (4)Violation of permit. Any person who commences work without a valid permit shall be charged in accordance with the fee schedule approved by resolution of the city commission.(5)When permit not required. No permit will be required for general maintenance or repairs which do not result in a change in occupancy as defined by the Florida Building Code and the value of the complete job is less than one thousand five hundred dollars ($1,500.00) in labor and materials, as determined by the building official.
Full Breakdown
Chapter 9 of the Margate Code controls who can pull a permit and when one is needed. Section 9-4 makes it unlawful to construct, alter, move, enlarge, replace, repair, install equipment, change use or occupancy, remove or demolish any building or structure in the City of Margate unless the person or firm holds a certificate of competency issued by the state Department of Business and Professional Regulation under F.S. Chapter 489 parts one and two, or by the Broward County central examining board. Section 9-5 follows: applications for permit are accepted only from persons or firms qualified under section 9-4. Section 9-7 adopts the 2007 edition of the Florida Building Code, all future amendments and any successor code, together with the Broward County Administration Section 100, as the city's minimum building requirements.
Section 9-21 sets the money side. Permit fees are set by resolution of the city commission, and each fee includes inspection of the completed work. Extra inspection trips for condemned work, work that does not match the code or approved plans, or work not ready when called are charged separately, and payment is due before the next reinspection or permit. Estimated costs use a verified contract figure or the R.S. Means cost data, whichever is greater. A person who begins work without a valid permit is charged under the commission's fee schedule. A refund of a building permit fee requires that the permit was received within the prior six months, work has not commenced, the same applicant applies in writing with the permit and job card, and the applicant has not been cited for unpermitted work in the past twelve months. The refund is reduced by a processing fee.
Related limits sit nearby. Construction equipment cannot run between 7:00 p.m. and 7:00 a.m. or on Sundays and federal holidays under section 9-6, though the building official can grant special permits of up to thirty days. A pool contractor must post a $500.00 cash bond before a pool permit issues under section 9-6.1. Section 40.309 of the Land Development Code lets the Department of Environmental and Engineering Services, Development Services Department, and Building and Code Services Department issue permits once every requirement is met.
Violations & Fines
Working without a valid permit brings a charge under the fee schedule the city commission adopts by resolution, and a person cited for unpermitted work loses refund eligibility for twelve months under section 9-21(12). Building code citations under the section 1-8 schedule run $75.00 for a first offense, $100.00 for a second and $150.00 for a third, and $150.00 to $500.00 for a fourth. Section 1-8(a) separately caps a convicted general-penalty fine at $500.00 and up to sixty days in jail.
Frequently Asked Questions
Do I need a building permit for small repairs in Margate, FL?
Can a homeowner apply for the permit or does a contractor have to?
What building code does the City of Margate use?
Can I get a permit fee refunded?
Sources & Official References
Other rules in Margate
Florida rules heatmap·Compare Margate to another location·View the Florida building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Broward County handle building permits.