Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Enforcing office
Lead Building Inspector
Residential code adopted
SPS 320-325, Wis. Adm. Code
Commercial code adopted
SPS 361-366, Wis. Adm. Code
Local exception
UBC Section 30.05(1)(g) excluded
First-offense penalty
$5 to $1,000 forfeiture
Governing chapter
City Code Chapter 80

Summary

New Berlin adopts the Wisconsin Uniform Building Code and the state's One- and Two-Family and Commercial Building Codes by reference for all construction citywide, with one local exception. The Lead Building Inspector and staff certified by the Department of Safety and Professional Services administer and enforce every provision, issuing the permits construction requires.

A.Adopted. The Wisconsin Uniform Building Code prepared by the Building Inspectors Association of Southeastern Wisconsin in January 1967, together with all subsequent revisions, amendments and supplements, is hereby adopted and incorporated into this chapter by reference. A copy of such Wisconsin Uniform Building Code, together with all revisions, amendments and supplements thereto, shall be on file and open to public inspection in the office of the City Clerk.B.Specific exception. The following provisions of the Wisconsin Uniform Building Code are specifically excepted and not included as part of this chapter: Section 30.05(1)(g).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 3 Update 1).

Full Breakdown

City Code Chapter 80 adopts the Wisconsin Uniform Building Code, first prepared by the Building Inspectors Association of Southeastern Wisconsin in January 1967, along with all later revisions, incorporating it by reference into the chapter. A copy stays on file and open for public inspection in the City Clerk's office. 05(1)(g) of the Uniform Building Code does not apply here. A separate recreation-room exception lets basements in houses built before June 1, 1980 keep a six-foot-four-inch ceiling, with recessed lighting and no paddle fans required where ceilings run under seven feet, and stair treads at least eight inches wide.

Section 80-2 layers on the Wisconsin Administrative Code: SPS 320 through 325 for one- and two-family dwellings and SPS 361 through 366 for commercial buildings, both incorporated with all future amendments. The Lead Building Inspector and representatives certified by the Wisconsin Department of Safety and Professional Services administer and enforce both subchapters, the office that reviews plans and issues the building permits a project needs before construction starts. Related impact fees under Section 80-3 apply separately to new development connecting to municipal utilities or increasing residential density, assessed against the fee payer at permit application under the City's 1995 Comprehensive Impact Fee Study Addendum A.

Violations & Fines

Chapter 80 violations carry the general penalty set by Section 1-18: a first offense draws a forfeiture of not less than $5 nor more than $1,000 plus costs of prosecution, with jail up to 90 days if unpaid; a second offense within a year runs $10 to $1,000 plus costs, with jail up to six months. Each day a violation continues counts as a separate offense, and the City may pursue an execution against the violator's property in lieu of jail.

Frequently Asked Questions

Does New Berlin have its own building code?
Not a separate one. Chapter 80 of the City Code adopts the Wisconsin Uniform Building Code and the state's SPS 320-325 (one- and two-family) and SPS 361-366 (commercial) administrative codes by reference, with a single carved-out exception at UBC Section 30.05(1)(g). The Lead Building Inspector enforces the adopted state provisions as City law.
Who issues building permits in New Berlin?
The Lead Building Inspector and representatives certified by the Wisconsin Department of Safety and Professional Services administer and enforce the adopted building codes under Chapter 80, and that office issues the permits required for new construction, additions and remodeling before work begins.
Can I finish a basement without meeting the ceiling-height rule?
Only if the house was built before June 1, 1980: Section 80-1 lets those basements keep a six-foot-four-inch ceiling, with recessed lighting and no paddle fans under seven feet, and stair treads at least eight inches wide, instead of the full Uniform Building Code standard.
What happens if I build without a permit in New Berlin?
Chapter 80 violations fall under the City's general penalty, Section 1-18: a forfeiture of $5 to $1,000 plus court costs for a first offense, doubling in range for repeat violations within a year, with jail time possible if the forfeiture goes unpaid.

Sources & Official References

Other rules in New Berlin

All New Berlin rules

Compare New Berlin to another location·View the Wisconsin building safety overview

Get notified when Building Permits in New Berlin, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Waukesha County handle building permits.

Waukesha, WI
Some Restrictions