Key Facts

Governing section
City Code § 106-17
Low-voltage exemption
120V/20A cord-and-cap equipment
Fire alarm systems
Always require a permit
Permit lapses after
120 days without starting work
Working without permit
Doubles the permit fee
Homeowner privilege excludes
Remodels over 1,500 sq ft

Summary

No wiring, electrical equipment installation or alteration may begin in New Berlin without first notifying the Electrical Inspector and securing a permit under Section 106-17. Low-voltage plug-in equipment is exempt, but new or replacement fire alarm systems always need a permit and a licensed installer.

A.Permit required. No building, structure or premises shall be wired for electric lights, meters, heating units, signs, refrigeration or other electrical wiring nor shall any electrical equipment be installed nor shall any alteration or change be made in any wiring system, nor shall electric current be supplied to any new electrical system, before notifying the Electrical Inspector and securing a permit and/or authority to proceed with the work.B.Permit not required. No permits shall be required for the connection of electrical equipment having a rating of not greater than 120 volts or 20 amps and having an attachment cord and cap for connection to a permanently installed receptacle, except that a permit shall be required for the installation of a new fire alarm system or the replacement of an existing fire alarm system.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 3 Update 1).

Full Breakdown

Section 106-17 A requires anyone wiring a building, structure or premises for electric lights, meters, heating units, signs or refrigeration, installing electrical equipment, or altering an existing wiring system, to notify the Electrical Inspector and secure a permit before starting work. Section 106-17 B carves out a narrow exemption: equipment rated no higher than 120 volts or 20 amps with a cord-and-cap plug into a permanently installed receptacle needs no permit, but that exemption never covers a new or replacement fire alarm system, which always needs a permit and, under this chapter, a licensed installer.

To obtain a permit, a contractor licensed for the work, or someone otherwise authorized under Chapter 101, Wis. , files an application with the Electrical Inspector naming the property owner, the work address and a description of the work, along with the required fee. A permit lapses if work does not start within 120 days of issuance, or if suspended work stays stopped for 120 days; a written request before expiration can extend it another 120 days. Working before a permit issues doubles the fee.

Homeowners may wire their own single-family residence themselves after securing a permit, paying fees and passing inspection, but that privilege never covers new electrical services or service upgrades, in-ground pools, spas or hot tubs, new construction before an occupancy permit, or remodeling over 1,500 square feet.

Violations & Fines

Working without first securing an electrical permit doubles the total permit fee under Section 106-22, without excusing the contractor from every other requirement of the chapter. General violations of Chapter 106 are punished under Section 1-18: a forfeiture of $5 to $1,000 plus court costs for a first offense, and the Electrical Inspector may post a stop-work order barring further work until the premises comply.

Frequently Asked Questions

Do I need a permit to rewire an outlet in New Berlin?
Generally yes. Section 106-17 A requires a permit from the Electrical Inspector for any new wiring, alteration or equipment installation. The only exemption is for cord-and-plug equipment rated 120 volts/20 amps or less connecting to an existing permanently installed receptacle.
Can a New Berlin homeowner do their own electrical work?
Yes, under Section 106-24's homeowner's privilege, but only in a single-family home the owner occupies as a permanent residence, and only after securing a permit, paying fees and passing inspection. It does not cover new services, in-ground pools, pre-occupancy new construction, or remodels over 1,500 square feet.
What happens if I start electrical work before getting a permit?
Section 106-22 doubles the total permit fee, and that doubled fee does not excuse you from meeting every other requirement of Chapter 106 or from other penalties the chapter allows, including a possible stop-work order from the Electrical Inspector.

Sources & Official References

Other rules in New Berlin

All New Berlin rules

Compare New Berlin to another location·View the Wisconsin building safety overview

Get notified when Electrical Permits in New Berlin, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Waukesha County handle electrical permits.

Waukesha, WI
Some Restrictions