Prescott Valley, AZ Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit issued by
The building official, separate permit for each building or structure
Shed exemption
One-story, projected roof area not over 144 square feet
Retaining wall exemption
Not over 32 inches, footing to top of wall
Deck and flat work exemption
Not over 200 square feet and 30 inches above grade
Repair exemption
Not over $500.00 in twelve months, no trade systems affected
Application life
Abandoned at 180 days; one extension up to 180 days
Criminal penalty
Class 1 misdemeanor, up to $2,500.00 and six months

Summary

In the Town of Prescott Valley, Arizona, no building, structure or building service equipment regulated by the technical codes can be erected, altered, moved, removed, converted or demolished until the building official issues a separate permit for each one. Town Code § 7-01-140 lists the exempt work, and the building permit sits on top of any zoning, subdivision or engineering approval.

A. Permits Required. Except as specified in subparagraph B of this Section, no building, structure or building service equipment regulated by the technical codes, including this administrative code, shall be erected, constructed, reconstructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a separate appropriate permit for each building, structure or building service equipment has first been obtained from the building official. This requirement includes, but is expressly not limited to, obtaining an appropriate permit for construction, installation or alteration of all fences, retaining walls, fireplaces, wood stoves, and other gas, electric, or solid fuel burning appliances and equipment. This requirement is also in addition to any zoning, subdivision and/or engineering approvals and permits required in the technical codes or elsewhere in this Code. ... B. Work Exempt from Permit. A building permit shall not be required for the types of work in each of the separate classes of permit listed below.

Full Breakdown

Section 7-01-140(A) of the Prescott Valley Town Code opens with a flat rule: a separate appropriate permit for each building, structure or building service equipment must be obtained from the building official before the work begins. The list of covered actions is long: erected, constructed, reconstructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished. The Town adds that the requirement is expressly not limited to buildings, and names fences, retaining walls, fireplaces, wood stoves and other gas, electric or solid fuel burning appliances. It is also in addition to any zoning, subdivision or engineering approvals required elsewhere in the Town Code.

Subsection (C) lists work that needs no building permit. One-story detached accessory buildings used with one and two family dwellings as tool and storage sheds, playhouses and similar uses are exempt when the projected roof area does not exceed 144 square feet and the building meets the zoning requirements. Retaining walls not over 32 inches in height, measured from the top of the footing to the top of the wall, are exempt unless they support a surcharge or impound flammable liquids. Platforms, decks, walks, driveways and flat work not exceeding 200 square feet and not more than 30 inches above grade are exempt, as are residential shade cloth structures not exceeding 200 square feet and repairs that do not total over $500.00 in any twelve month period and do not affect electrical, plumbing or mechanical installations. Subsection (B) closes the loophole: an exemption from the building permit is not an exemption from zoning or engineering permits, and separate plumbing, electrical and mechanical permits are still required where applicable. Even an exempt shed stays subject to inspection by the building official.

Before issuing a permit the building official can require engineering from the applicant, including off-site engineering, and must first review and approve a Sewer Connection Plan. For a new building or a mobile, manufactured or modular home, the applicant must show the proposed location of culverts at every driveway access across roadside bar ditches, and the Town Engineer issues the culvert installation permit. Section 7-01-150 then governs the written application. An application is deemed abandoned 180 days after filing unless it is pursued in good faith or a permit has been issued, and the building official can grant one extension not exceeding 180 days.

Violations & Fines

Work done without a required permit violates Chapter 7 of the Town Code. Under § 7-01-130, a guilty person commits a class 1 misdemeanor, punishable by a fine not to exceed $2,500.00, imprisonment not to exceed six months, or both, and each day a violation continues is a separate offense. The civil sanction is up to $250.00 per citation. Under § 7-01-170(E), work started without a permit triggers a special investigation and an investigation fee, charged in addition to the permit fee whether or not a permit is later issued.

Frequently Asked Questions

Do I need a building permit for a storage shed in Prescott Valley?
Not if it is a one-story detached accessory building used with a one or two family dwelling as a tool or storage shed or playhouse, the projected roof area does not exceed 144 square feet, and it meets the applicable zoning requirements. It is still subject to inspection by the building official under § 7-01-140(C)(1).
Does a building permit exemption also excuse me from zoning approval?
No. Section 7-01-140(B) states that exemption from building permit requirements is not an exemption from zoning or engineering permit requirements, and it does not authorize work that violates the technical codes or any other Town Code provision. Separate plumbing, electrical and mechanical permits are also still required where applicable.
What happens if I start work before getting the permit?
A special investigation is made before a permit can be issued, and an investigation fee in the amount set in the Comprehensive Fee Schedule is collected in addition to the permit fee. Paying it does not excuse compliance with the technical codes or any penalty prescribed by law, under § 7-01-170(E).
How long does a permit application stay open?
Under § 7-01-150(C), an application is deemed abandoned 180 days after filing unless it has been pursued in good faith or a permit has been issued. The building official can grant one extension not exceeding 180 days, and the request must be in writing with justifiable cause shown.

Sources & Official References

Other rules in Prescott Valley

All Prescott Valley rules

Compare Prescott Valley to another location·View the Arizona building safety overview

Get notified when Building Permits in Prescott Valley, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.