Prescott Valley, AZ Building Safety: Building Inspections (2026)
Key Facts
- Who requests
- The person doing the work, when ready for inspection
- Request lead time
- Building official can require one working day ahead
- Request methods
- Writing, Selectron telephone system, or another approved method
- Footing inspection
- After excavations complete and reinforcing steel in place
- Equipment replacement
- Inspection request within 48 hours after work is completed
- Temporary certificate of occupancy
- 90 days for R-3 and U; 180 days for all other uses
Summary
In the Town of Prescott Valley, Arizona, the permit holder must notify the building official when work is ready for inspection, and work cannot go past each inspection point without approval. Town Code § 7-01-180 sets the stages from footing to final, and § 7-01-190 requires a certificate of occupancy before use.
B. Inspection Requests. It shall be the duty of the person doing the work authorized by a permit to notify the building official that such work is ready for inspection. The building official may require that every request for inspection be filed at least one working day before such inspection is desired. ... C. Approval Required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. ... There shall be a final inspection and approval of all buildings and structures when completed and ready for occupancy and use. D. Required Building Inspections. ... Upon notice, the building official shall make the following inspections: 1. Footing Footing inspection shall be made after excavations for footings are complete and any required reinforcing steel is in place. ... 13. Final Inspection - Final inspection shall be made after the permitted work is completed and prior to occupancy.
Full Breakdown
Inspections are governed by § 7-01-180 of the Prescott Valley Town Code. Work stays accessible and exposed until the building official approves it, and the permit applicant carries the duty of keeping it that way. If the building official needs to verify compliance, the official can require removal of concealing materials, and neither the building official nor the Town is liable for the cost of removing or replacing them. As an alternative, the permittee can submit a signed letter certifying compliance with all technical codes along with a dated, signed and sealed report from an Arizona registrant.
The person doing the work must notify the building official when it is ready for inspection. The building official can require each request at least one working day before the inspection is desired, and requests can be made in writing, by telephone using the Selectron Inspection Request System, or by another approved method. Work cannot go beyond the point of each successive inspection without approval, and noncompliant portions must be corrected and left uncovered until authorized.
Subsection (D) lays out the stages: footing, after excavations are complete and any required reinforcing steel is in place; stem wall and grout, before any grout or concrete is placed; floodplain documentation of the lowest floor in flood-prone areas; under-slab plumbing and water and sewer yardlines, before backfilling; concrete slab and under-floor; roof nailing and exterior braced wall panels; rough combo; moisture and air barrier; insulation; gypsum board and exterior lath; special inspections; and a final inspection after the permitted work is completed and prior to occupancy. Blown or sprayed roof or ceiling insulation can be verified before final with markers, a minimum of one marker for each 300 square feet, plus a certificate from the insulation installer. Building service equipment is inspected separately and cannot be connected to the water, fuel, power or sewer supply until authorized. Replacement equipment serving an occupied portion needs an inspection request within 48 hours after the work is completed.
Section 7-01-190 closes the process: no building can be used or occupied, and no change in occupancy classification made, until the building official issues a certificate of occupancy. A temporary certificate cannot exceed 90 days for R-3 and U occupancies or 180 days for all other uses.
Violations & Fines
Covering work before approval breaks § 7-01-180(C), which requires noncompliant portions to stay uncovered until the building official authorizes them. Re-inspection fees can be assessed under § 7-01-180(D)(13)(d) and (E)(4) when work is not complete, the posted card or plans are missing, access is not provided, or work deviates from approved plans, and further inspection stops until the fees are paid. Occupying without a certificate violates § 7-01-190(A). Chapter 7 violations carry a class 1 misdemeanor under § 7-01-130: a fine up to $2,500.00 and up to six months, or a civil sanction up to $250.00, with each day a separate offense.
Frequently Asked Questions
How do I request a building inspection in Prescott Valley?
Can I cover work before the inspector approves it?
Can the Town charge for repeat inspections?
When can I move into a newly built structure?
Sources & Official References
Other rules in Prescott Valley
Compare Prescott Valley to another location·View the Arizona building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.