Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Any construction, alteration, repair, move or demolition
Repair exemption
Maintenance-only repairs $500 or less need no permit
Enforcing agency
Department of Safety and Inspections building official
Permit expiration
Void after 180 days without starting work
Working without permit
Standard fee plus equal penalty fee
Violation penalty
Misdemeanor, up to $1,000 fine, 90 days jail

Summary

Saint Paul requires a building permit from the Department of Safety and Inspections before anyone constructs, enlarges, alters, repairs, moves, demolishes or changes the occupancy of a building or structure. Only maintenance-only repairs and minor alterations costing $500 or less are exempt under Legislative Code § 33.03(a).

(a)Building and general construction. No person shall construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure without first obtaining a building permit from the building official. Permits for building or general construction are not required for repairs for maintenance only or for minor alterations provided they are not required under the state building code, this chapter or other pertinent provisions of the Saint Paul Legislative Code, and provided the cost of such repairs and minor alterations does not exceed the present market value of five hundred dollars ($500.00).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 133 Update 1).

Full Breakdown

03(a) of the Legislative Code sets the trigger: any construction, enlargement, alteration, repair, move, demolition or occupancy change on a building or structure needs a permit from the building official before work starts. The only carve-out is for repairs done purely for maintenance, or minor alterations, that are not otherwise required under the state building code or the Legislative Code and that cost no more than $500 in present market value. 04 on a sliding valuation scale: $36 for the first $500 of value plus $5 per additional $100 up to $2,000, rising to $8,463 for the first $1,000,000 plus $5 per additional $1,000 on large jobs.

Plan review, required once valuation exceeds $1,000, costs 65 percent of the permit fee, with a minimum $85 pre-application deposit due before review begins. A permit is void if work does not start within 180 days of issuance or is abandoned for 180 days, and DSI may grant one 180-day extension on written request. If work is performed before a permit is obtained, DSI collects the normal fee plus an equal penalty fee. 06 is completed, and those applications require a $5,000 deposit or bond. 05 caps a misdemeanor fine at $1,000 with up to 90 days in jail.

Violations & Fines

Working without a permit under § 33.03 triggers double fees. DSI charges the standard permit fee plus a matching penalty fee before signing off on the job, and unpermitted work is a misdemeanor under § 33.09. Citywide, § 1.05 caps a Legislative Code misdemeanor at a $1,000 fine and 90 days in jail; petty misdemeanors specifying only a fine top out at $200. DSI may also revoke a permit issued in error.

Frequently Asked Questions

Does Saint Paul really require a permit for small repairs?
Only if the repair costs more than $500 in market value or isn't purely maintenance. Section 33.03(a) exempts maintenance-only repairs and minor alterations at $500 or less, as long as they aren't separately required under the state building code or another Legislative Code section. Anything larger, or any change in occupancy, needs a permit from the building official before work starts.
What happens if I start work before getting a permit?
The Department of Safety and Inspections still collects the standard permit fee under § 33.04, plus an equal penalty fee: effectively doubling the cost. Unpermitted work is also a misdemeanor under § 33.09, punishable citywide under § 1.05 by up to a $1,000 fine and 90 days in jail.
How long is a Saint Paul building permit good for?
A permit becomes void if the authorized work hasn't started within 180 days of issuance, or if it's abandoned for 180 days after starting. The building official can grant one 180-day extension on written request showing circumstances beyond the applicant's control; after that, a new permit and full fee are required.

Sources & Official References

Other rules in Saint Paul

All Saint Paul rules

Compare Saint Paul to another location·View the Minnesota building safety overview

Get notified when Building Permits in Saint Paul, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.