Salt Lake County requires building permits for most construction in unincorporated areas, enforced by the County Building Services and Permits Division under Title 15 of the County Code. The County has adopted the 2021 International Building Code, International Residential Code, and International Fire Code with Utah state amendments. Permits are required for new structures, additions, most remodels, electrical, plumbing, mechanical, and accessory structures over 200 square feet.
Salt Lake County Building Services administers building permits for all unincorporated areas including Magna, Kearns, White City, Copperton, Emigration Canyon, and the canyons. Title 15 of the Salt Lake County Code of Ordinances adopts the International Code Council family of codes along with Utah state amendments promulgated by the Utah Uniform Building Code Commission. A permit is required before beginning construction on new buildings, additions, structural alterations, re-roofing with material changes, decks over 30 inches above grade, retaining walls over 4 feet, swimming pools and spas, solar PV systems, electrical service changes, water heater replacement, furnace and HVAC replacement, and most plumbing rough-ins. Detached accessory structures under 200 square feet and not containing plumbing or mechanical systems are typically exempt from building permits but still must comply with zoning setbacks. Submittal requirements include site plans showing setbacks, construction drawings stamped by a Utah-licensed design professional for structures over certain thresholds, energy code compliance documentation, and structural calculations for engineered elements. The County charges plan review fees at approximately 65 percent of the building permit fee. Inspections follow the standard IRC sequence including footing, foundation, framing, rough electrical, rough plumbing, rough mechanical, insulation, and final. Altitude-related requirements apply in canyon areas with heavy snow loads reaching 90 pounds per square foot or higher in upper Cottonwood Canyons. Work started without a permit is subject to double fees and potential stop-work orders.
Contact your local code enforcement office for specific penalty information.
Other ordinances people look up for this city. Green dot = verified primary-source excerpt.
West Valley City, UT
Driveways must be constructed of approved hard-surface material such as concrete or asphalt; new or widened driveways require a curb-cut permit from Public W...
West Valley City, UT
On-street parking is generally allowed but vehicles cannot remain parked in the same spot for more than 48 hours; posted restrictions and snow ordinances apply.
West Valley City, UT
Residential EV charger installation requires an electrical permit; Utah state law protects EV charging rights in HOAs and encourages public charging infrastr...
West Valley City, UT
Overnight parking on city streets is generally permitted subject to the 48-hour rule; no blanket overnight ban exists but snow-route restrictions apply in wi...
West Valley City, UT
West Valley City may allow backyard chickens with limits. Roosters typically banned in residential areas. Livestock requires agricultural zoning.
West Valley City, UT
Backyard fires in West Valley City are limited to approved enclosed fire pits burning clean wood or propane. Open burning prohibited year-round. No burning o...
See how West Valley City's building permits rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.