Gilroy, CA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2025 California Electrical Code
New services
Must be installed underground, Sec. 230.2(F)
Main disconnect
Required on first floor level, Sec. 230.70(A)(4)
Grounding
20 ft. concrete-encased electrode in new buildings
Permit fee
Set by City of Gilroy Comprehensive Fee Schedule

Summary

The City of Gilroy has adopted the 2025 California Electrical Code as its electrical code under City Code § 6.6(b)(3), and Section 109.2 requires a permit fee for electrical systems or alterations under the current City of Gilroy Comprehensive Fee Schedule. Local amendments in § 6.7(c) also require new electrical services to be installed underground.

(3) The 2025 California Electrical Code, published by the National Fire Protection Agency and the California Building Standards Commission in Part 3 of Title 24 of the California Code of Regulations, is hereby adopted and referred to, and by this reference expressly incorporated and made a part of this chapter as though fully set forth herein. ... ... § 6.7. Amendments. (a) ... (3) Amend Section 109.2 to read as follows: 109.2 Schedule of permit fees. On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as required by the currently adopted City of Gilroy Comprehensive Fee Schedule. ... (c) Amendments to the Electrical Code. (1) Amend Section 230.2 by adding subsection (F) to read as follows: 230.2(F). Underground Service. All new electrical services shall be underground and installed per Section 230.30, Underground Service-Lateral Conductors.

Full Breakdown

City Code § 6.6(b)(3) adopts the 2025 California Electrical Code, published by the National Fire Protection Agency and the California Building Standards Commission in Part 3 of Title 24 of the California Code of Regulations, "and by this reference expressly incorporated and made a part of this chapter as though fully set forth herein," designating it as the "electrical code" for the City of Gilroy, with one copy on file in the office of the building official for public examination. Section 6.7(a)(3) amends Section 109.2, Schedule of permit fees, so that a fee is charged for electrical systems or alterations requiring a permit, set by the currently adopted City of Gilroy Comprehensive Fee Schedule.

Article II's electrical amendments in § 6.7(c) go further than fees: subsection 230.2(F) requires all new electrical services to be installed underground per Section 230.30, and requires existing overhead utilities in existing commercial and industrial areas, and in residential areas developing four or more dwelling units, to be placed underground in connection with new development. Section 230.70(A)(4) requires the building's main service disconnect to be installed on the first-floor level. Section 250.50(A) requires grounding electrode systems in new buildings to use a concrete-encased electrode of at least 20 feet of steel reinforcing bar or bare copper conductor.

The building official administers these permits, and, as with all Chapter 6 permits, work started before the permit issues doubles the fee under Section 109.4.

Violations & Fines

An electrical permit application that skips the undergrounding, disconnect-location or grounding amendments in § 6.7(c) will not clear plan review by the building official, since those subsections are written directly into the adopted 2025 California Electrical Code for Gilroy. As with any Chapter 6 permit, starting electrical work before the permit is issued doubles the fee due under § 6.7(a)(4)'s amendment to Section 109.4, charged against the City of Gilroy Comprehensive Fee Schedule.

Frequently Asked Questions

What electrical code does Gilroy use?
The City of Gilroy has adopted the 2025 California Electrical Code by reference under City Code § 6.6(b)(3), designating it the city's "electrical code" with a copy on file in the building official's office. Permit fees for electrical work are charged under Section 109.2 based on the current City of Gilroy Comprehensive Fee Schedule.
Does Gilroy require new electrical service to be underground?
Yes. City Code § 6.7(c)(1) amends Electrical Code Section 230.2 to add subsection (F), requiring all new electrical services to be installed underground, and requiring existing overhead utilities to be undergrounded when commercial or industrial property redevelops, or when four or more residential dwelling units are developed or redeveloped.
Where must the main electrical disconnect be located in Gilroy?
City Code § 6.7(c)(2) amends Electrical Code Section 230.70(A) to add subsection (4), requiring the building's main service disconnect to be installed on the first-floor level of the building, in accordance with the surrounding subsections of 230.70(A).

Sources & Official References

Other rules in Gilroy

All Gilroy rules

California rules heatmap·Compare Gilroy to another location·View the California building safety overview

Get notified when Electrical Permits in Gilroy, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Santa Clara County handle electrical permits.

Mountain View, CA
Some Restrictions
San Jose, CA
Some Restrictions
Santa Clara, CA
Some Restrictions
Sunnyvale, CA
Some Restrictions