Gilroy, CA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2025 California Electrical Code
- New services
- Must be installed underground, Sec. 230.2(F)
- Main disconnect
- Required on first floor level, Sec. 230.70(A)(4)
- Grounding
- 20 ft. concrete-encased electrode in new buildings
- Permit fee
- Set by City of Gilroy Comprehensive Fee Schedule
Summary
The City of Gilroy has adopted the 2025 California Electrical Code as its electrical code under City Code § 6.6(b)(3), and Section 109.2 requires a permit fee for electrical systems or alterations under the current City of Gilroy Comprehensive Fee Schedule. Local amendments in § 6.7(c) also require new electrical services to be installed underground.
(3) The 2025 California Electrical Code, published by the National Fire Protection Agency and the California Building Standards Commission in Part 3 of Title 24 of the California Code of Regulations, is hereby adopted and referred to, and by this reference expressly incorporated and made a part of this chapter as though fully set forth herein. ... ... § 6.7. Amendments. (a) ... (3) Amend Section 109.2 to read as follows: 109.2 Schedule of permit fees. On buildings, structures, electrical, gas, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as required by the currently adopted City of Gilroy Comprehensive Fee Schedule. ... (c) Amendments to the Electrical Code. (1) Amend Section 230.2 by adding subsection (F) to read as follows: 230.2(F). Underground Service. All new electrical services shall be underground and installed per Section 230.30, Underground Service-Lateral Conductors.
Full Breakdown
City Code § 6.6(b)(3) adopts the 2025 California Electrical Code, published by the National Fire Protection Agency and the California Building Standards Commission in Part 3 of Title 24 of the California Code of Regulations, "and by this reference expressly incorporated and made a part of this chapter as though fully set forth herein," designating it as the "electrical code" for the City of Gilroy, with one copy on file in the office of the building official for public examination. Section 6.7(a)(3) amends Section 109.2, Schedule of permit fees, so that a fee is charged for electrical systems or alterations requiring a permit, set by the currently adopted City of Gilroy Comprehensive Fee Schedule.
Article II's electrical amendments in § 6.7(c) go further than fees: subsection 230.2(F) requires all new electrical services to be installed underground per Section 230.30, and requires existing overhead utilities in existing commercial and industrial areas, and in residential areas developing four or more dwelling units, to be placed underground in connection with new development. Section 230.70(A)(4) requires the building's main service disconnect to be installed on the first-floor level. Section 250.50(A) requires grounding electrode systems in new buildings to use a concrete-encased electrode of at least 20 feet of steel reinforcing bar or bare copper conductor.
The building official administers these permits, and, as with all Chapter 6 permits, work started before the permit issues doubles the fee under Section 109.4.
Violations & Fines
An electrical permit application that skips the undergrounding, disconnect-location or grounding amendments in § 6.7(c) will not clear plan review by the building official, since those subsections are written directly into the adopted 2025 California Electrical Code for Gilroy. As with any Chapter 6 permit, starting electrical work before the permit is issued doubles the fee due under § 6.7(a)(4)'s amendment to Section 109.4, charged against the City of Gilroy Comprehensive Fee Schedule.
Frequently Asked Questions
What electrical code does Gilroy use?
Does Gilroy require new electrical service to be underground?
Where must the main electrical disconnect be located in Gilroy?
Sources & Official References
Other rules in Gilroy
California rules heatmap·Compare Gilroy to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Santa Clara County handle electrical permits.