Hackensack, NJ Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Issuing official
Electrical Subcode Official (§166-1)
Base receptacle/fixture fee
$50 for first 25 devices
Additional device fee
$35 per 20 more devices
Service panel fee range
$50 to $300 by amperage
Plan review surcharge
20% of permit fee

Summary

Hackensack's Electrical Subcode Official, created by Section 166-1 within the local Uniform Construction Code enforcing agency, issues electrical permits under the fee schedule in Section 166-3A(9): $50 for the first 25 receptacles or fixtures, $35 for each additional 20, and fees running from $50 up to $300 for service panels depending on amperage.

§ 166-1. Enforcing agency established. A. There is hereby established in the City of Hackensack a State Uniform Construction Code enforcing agency ... consisting of a Construction Official, Building Subcode Official, Plumbing Subcode Official, Electrical Subcode Official, Fire Protection Subcode Official and such other subcode officials for such additional subcodes ... (9) Electrical subcode fee schedule. (a) Receptacles and fixtures and low-voltage, systems devices. [1] One to 25: $50. [2] Each additional 20 devices or part thereof: $35. ... (d) Service panels, entrances and subpanels. [1] Up to 200 amperes: $50. [2] 201 to 1,000 amperes: $150. [3] Over 1,000 amperes: $300.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4592721; v20 updated 2026-01-06; through 01-06-2026).

Full Breakdown

C. 5:23; the underlying wiring standards themselves are set by the state's electrical subcode, not by City ordinance. L. C. 5:23. 5 kilowatts; and service panels, entrances and subpanels run $50 up to 200 amperes, $150 for 201 to 1,000 amperes, and $300 above 1,000 amperes. A separate $50 fee applies to bonding or grounding swimming pools and whirlpools. Chapter 166 also charges a 20% plan-review fee on top of the construction-permit amount, nonrefundable but creditable against the permit fee.

Violations & Fines

Working without the required electrical permit or against an approved plan falls under Chapter 166's general Basic Code violation clause, Section 166-14, punishable by a fine of $25 to $500, up to 90 days' imprisonment, or both, with each day of continued noncompliance treated as a separate offense.

Frequently Asked Questions

How much does an electrical permit cost in Hackensack?
It depends on the work: Section 166-3A(9) charges $50 for the first 25 receptacles, fixtures or low-voltage devices and $35 for each additional 20, while a new service panel runs $50 up to 200 amperes, $150 for 201 to 1,000 amperes, and $300 above that.
Who reviews electrical permit applications in Hackensack?
The Electrical Subcode Official, one of the positions Section 166-1 creates within the Division of Building Inspection, reviews and issues electrical permits alongside the Construction Official and the Building, Plumbing and Fire Protection Subcode Officials, all qualified under the state's N.J.A.C. 5:23 rules.
Is there an extra fee on top of the electrical permit itself?
Yes. Section 166-3A(3) adds a plan-review fee equal to 20% of the construction-permit amount, due when the permit fee is calculated. It is nonrefundable, but the amount paid is credited toward the final construction-permit fee.

Sources & Official References

Other rules in Hackensack

All Hackensack rules

Compare Hackensack to another location·View the New Jersey building safety overview

Get notified when Electrical Permits in Hackensack, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.