Key Facts

Permit trigger
Any new, altered or repaired electrical work
New-structure installer
State-licensed electrical contractor only
Existing-structure installer
Licensed contractor or resident owner
Pre-permit requirement
Fee plus valid state contractor certificate
Concealment rule
Rough-in inspection before covering wiring
Enforcement
City electrical inspector, licensed electrician

Summary

In the City of Lakeville, Minnesota, City Code section 9-6-6 requires an electrical permit for every installation, alteration, addition or repair of electrical work for light, heat and power in the city. New-structure work must go through a state-licensed electrical contractor, while existing-structure work can also be done by the resident owner, and every permit carries a fee plus a state contractor's certificate requirement.

9-6-6: PERMITS AND INSPECTIONS: ... A. Permit Required: An electrical permit is required for each installation, alteration, addition or repair of electrical work for light, heat and power within the limits of the city. Permits for the installation of electrical work in new structures shall only be issued to electrical contractors duly licensed by the state. Permits for the installation, alteration, addition or repair of electrical work in existing structures shall only be issued to electrical contractors duly licensed by the state or to resident owners of property where the work is to be done. ... D. Fee: ... Before any permit is granted for the installation or alteration of electrical equipment, the person making application for such permit shall pay the city a fee in such amount as specified in the adopted schedule of fees and furnish proof of a valid state contractor's certificate. ... ... F. Concealment: All electrical installations which involve the concealment of wiring or equipment shall have a "rough-in" inspection prior to concealment, wherein the inspector shall be duly notified in advance, excluding Saturday, Sunday and holidays.

Full Breakdown

City Code section 9-6-6 implements Chapter 9-6, which the city adopted to apply the Minnesota State Building Code and Minnesota Rules chapter 1315, the National Electrical Code, within Lakeville. Subsection A requires an electrical permit for each installation, alteration, addition or repair of electrical work for light, heat and power in the city; permits for new structures may be issued only to electrical contractors licensed by the state, while permits for existing structures can go to a licensed contractor or to the resident owner of the property where the work is being done.

Subsection D requires a fee, set by the adopted fee schedule, before any permit is granted, and the applicant must furnish proof of a valid state contractor's certificate. The application itself, under subsection E, must be made in writing and accompanied by plans, specifications and schedules sufficient to show the installation will conform to legal requirements, with the inspection fee submitted alongside it; a permit issues once the applicant has complied with the chapter. Subsection F requires a rough-in inspection before any wiring or equipment is concealed, with the inspector notified in advance excluding weekends and holidays.

The electrical inspector position, created under section 9-6-2, is filled by a licensed master or journeyman electrician who reviews applications, grants permits, performs inspections, and can order equipment disconnected if it is found unsafe. A narrow exception in subsection B removes the permit requirement for equipment owned and operated by a public service corporation acting as a utility, though that equipment must still meet national electrical safety code standards.

Violations & Fines

Connecting electricity to equipment for which a permit is required, or that has been ordered disconnected, is unlawful under section 9-6-5. The electrical inspector can order a utility to disconnect service to any installation found unsafe or installed contrary to the adopted code, and can require disconnection within 15 days of written notice of a defect, or immediately in an emergency.

Frequently Asked Questions

Can I do my own electrical work in Lakeville?
If the work is in an existing structure and you are the resident owner of the property, section 9-6-6 allows you to be issued the permit yourself rather than hiring a licensed contractor. Work in a new structure, however, may only be permitted to an electrical contractor licensed by the state.
What do I need before an electrical permit is issued in Lakeville?
You need a written application describing the work, accompanied by plans and specifications sufficient to show compliance with the code, along with the permit fee set by the city's adopted fee schedule and proof of a valid state contractor's certificate, per section 9-6-6.
Do I need an inspection before covering up new wiring?
Yes. Section 9-6-6 requires a rough-in inspection before any wiring or equipment is concealed, and you must notify the inspector in advance, excluding Saturdays, Sundays and holidays, so the work can be checked while it is still visible.

Sources & Official References

Other rules in Lakeville

All Lakeville rules

Compare Lakeville to another location·View the Minnesota building safety overview

Get notified when Electrical Permits in Lakeville, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.