Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing code
Minnesota State Building Code, adopted by reference
Plumbing plan review
Triplicate plans required, non-single-family
Reviewing official
Minnesota certified building official
Penalty
Misdemeanor for code violation
Covers alterations too
Same rule for existing system changes

Summary

In the City of Lakeville, Minnesota, plumbing work is governed through the city's adoption of the Minnesota State Building Code under City Code section 9-1-1. Before installing a plumbing system in anything other than a single-family home, section 9-1-2 requires complete plumbing plans and specifications submitted in triplicate and approved by the building official, and a violation of the code is a misdemeanor under section 9-1-4.

The Minnesota state building code, as adopted by the commissioner of labor and industry pursuant to Minnesota statutes sections 16B.59 to 16B.75, including all amendments, rules and regulations established, adopted and published from time to time by the Minnesota commissioner of labor and industry, through the building codes and standards unit, is hereby adopted by reference with the exception of optional chapters, unless specifically adopted in this section. ... A Minnesota certified building official must be appointed by the city to administer the code. ... Prior to installation of a system of plumbing other than for a single-family dwelling, complete plumbing plans and specifications, together with any additional information that the building official may require, shall be submitted in triplicate and approved by the building official. No construction shall proceed except in accordance with the approved plans. Any alteration or extension of an existing plumbing system shall be subject to these same requirements. ... A violation of this code is a misdemeanor.

Full Breakdown

City Code section 9-1-1 adopts the Minnesota State Building Code, as maintained by the commissioner of labor and industry under Minnesota Statutes sections 16B.59 to 16B.75, by reference for Lakeville, with the exception of optional chapters unless the city specifically adopts them; that adoption is what pulls the state plumbing provisions of the building code into force citywide. Section 9-1-2 sets the administrative rules the city layers on top of the state code: a Minnesota certified building official must be appointed to administer it, and before anyone installs a system of plumbing in a building other than a single-family dwelling, complete plumbing plans and specifications, along with any additional information the building official requires, must be submitted in triplicate and approved before construction starts.

No plumbing construction may proceed except in accordance with those approved plans, and the same triplicate-review requirement applies to any alteration or extension of an existing plumbing system, not just new installations. Site and construction plans generally must also be submitted and approved before a building permit issues, and a certificate of occupancy cannot be granted until the inspected work, including plumbing, is signed off by the building official. Section 9-1-4 backs the whole chapter with a criminal penalty: a violation of the adopted code, including the plumbing plan-approval requirement, is a misdemeanor.

Violations & Fines

Installing or altering a plumbing system without the required triplicate plans approved by the building official, or proceeding with construction before that approval, violates City Code section 9-1-2 and, through section 9-1-4, is a misdemeanor. The building official can withhold a certificate of occupancy until the plumbing work passes inspection, and unapproved plumbing changes discovered later can trigger a stop-work order along with the criminal charge.

Frequently Asked Questions

Do I need a permit to change plumbing in my Lakeville home?
For a single-family dwelling, the code's triplicate plan-review requirement in section 9-1-2 does not apply the same way it does to other buildings, but all plumbing work still falls under the adopted Minnesota State Building Code and must be inspected and approved by the city's building official before it is covered up or put into use.
What plumbing code does Lakeville use?
Lakeville adopts the Minnesota State Building Code by reference under City Code section 9-1-1, including the amendments and rules published by the state's building codes and standards unit, rather than writing its own separate plumbing code. Optional chapters of the state code apply only if the city specifically adopts them.
What happens if I skip plumbing plan approval before building?
Section 9-1-2 requires plumbing plans and specifications to be approved before construction proceeds, and section 9-1-4 makes any violation of the adopted code a misdemeanor. The building official can also refuse to issue a certificate of occupancy until the plumbing work is inspected and found compliant.

Sources & Official References

Other rules in Lakeville

All Lakeville rules

Compare Lakeville to another location·View the Minnesota building safety overview

Get notified when Plumbing Permits in Lakeville, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.