Skip to main content
CityRuleLookup

Montgomery, AL Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
National Electrical Code, 2026 Edition
Permit required
Before any wiring/appliance connection
Permit validity
Expires after 90 days of no work
Contractor license
Current state electrical contractor's license required
Appeals board
9-member board, hears appeal within 10 days
Defective wiring fine
$1-$500 if uncorrected after 10-day notice

Summary

Montgomery has adopted the 2026 National Electrical Code and requires a written permit from the city electrical division before any wiring, apparatus, or electrical appliance is connected. Applications must name the property owner, the licensed electrical contractor doing the work, and the exact job location, and a separate permit covers each job.

(a) Application. Before beginning any work an application must be filed with the electrical division and must show the name of the owner or owners of the property or the person for whom the work is being done, the name or names of the electrical contractor who is responsible for the work, the street address of the building, structure or property where the work is to be performed, the number of the lot and block when applicable, the exact location or other sufficient description as may be requested and a clear description of the work to be performed.(b) Permit. No person, firm or corporation shall connect or cause to be connected any electrical wiring or appliances hereinafter defined without first obtaining a written permit for such work from the city electrical division. A separate permit must be obtained for each job and for each separate piece of work of any description, including alteration, extensions, and repair, except for minor repairs.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27).

Full Breakdown

Under Code Section 5-111, the city council adopted the National Electrical Code, 2026 Edition, prepared by the National Fire Protection Association, as controlling within the corporate limits and police jurisdiction of the City of Montgomery. Section 5-115 then sets the permitting mechanics: before any electrical work begins, an application must go to the electrical division showing the property owner's name, the responsible electrical contractor, the street address, lot and block number when applicable, and a clear description of the work. No person may connect or cause to be connected any electrical wiring or appliance without first obtaining a written permit from the city electrical division, and a separate permit is required for each job, including alterations, extensions, and repairs, except minor repairs.

Permits run for the duration of the work named on them but automatically expire if work stops for 90 days without good cause, and they also expire naturally on completion and final approval. Only a person holding a current state electrical contractor's license, or a neon/illuminated sign specialty license, can obtain a city electrical contractor's license from the revenue and license division to pull permits and perform the work; narrow exemptions cover low-voltage work under 50 volts, manufacturer testing, and city employees working on city-owned property.

Disputes over a permit decision go to the nine-member electrical board of adjustment and appeals, which must convene within ten days of a written appeal to the chief electrical inspector.

Violations & Fines

Connecting wiring or appliances without the required written permit, or performing work outside the scope of an issued permit, violates Section 5-115(b) and can bring a stop-work order plus business-license consequences for the responsible contractor. Section 5-122(e) separately fines an owner who fails to correct wiring defects within ten days of city notice not less than $1.00 nor more than $500.00 upon conviction.

Frequently Asked Questions

Do I need a permit for electrical work in Montgomery, Alabama?
Yes. Section 5-115(b) bars connecting or causing to be connected any electrical wiring or appliance without first obtaining a written permit from the city electrical division, and a separate permit is required for each distinct job, including alterations and repairs beyond minor fixes.
What electrical code does Montgomery enforce?
The city adopted the National Electrical Code, 2026 Edition, published by the National Fire Protection Association, under Code Section 5-111. Three copies are filed with the city clerk, and the code controls electrical installations both inside the city limits and in Montgomery's police jurisdiction.
How long does a Montgomery electrical permit stay valid?
It covers continuous performance of the described work but automatically expires once work stops for 90 days without good cause, and it also ends naturally when the job is finished and the electrical division gives final approval.
Who can pull an electrical permit in Montgomery?
Only someone licensed as an electrical contractor, or as a neon/illuminated sign specialty contractor, under a current state license, can obtain the required city electrical contractor's license from the revenue and license division needed to apply for permits.

Sources & Official References

Other rules in Montgomery

All Montgomery rules

Compare Montgomery to another location·View the Alabama building safety overview

Get notified when Electrical Permits in Montgomery, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.