Skip to main content
CityRuleLookup

Murfreesboro, TN Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit holder
Licensed electrical contractor
Adopted code
2017 National Electrical Code
Issuing office
Building and Codes Dept.
Late-start penalty
Permit fee doubled

Summary

Altering a home's electrical service, panel, or circuits in Murfreesboro is prohibited without a permit issued to a licensed electrical contractor by the Building and Codes Department.

Except as provided in Section 11-51(B), the following electrical work is prohibited within the City except where and as authorized by an electrical permit issued by the Department to a licensed electrical contractor: (a) altering or extending a building's service and/or branch circuits; (b) replacing, adding to, or otherwise altering a building's electrical panel; (c) adding one or more new circuits, outlets, switches, motors, devices, or other hard-wired equipment to a building's electrical system.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 18 Update 1).

Full Breakdown

Section 11-6 of the Murfreesboro City Code bars electrical work, including service or branch-circuit changes, panel replacement or alteration, new circuits or hard-wired equipment, and HVAC change-outs, unless a licensed electrical contractor holds a permit from the Building and Codes Department. The city adopted the 2017 National Electrical Code under Section 11-4, with local amendments in Section 11-4.1 covering items such as kitchen circuit rules and service-disconnect limits. Some jobs also require a separate building permit before the electrical permit can issue.

Violations & Fines

Starting electrical work before the permit issues doubles the required permit fee under Section 11-9(B), on top of any penalty for uninspected wiring.

Frequently Asked Questions

Can a homeowner pull their own electrical permit in Murfreesboro?
No. Section 11-8 requires applications to be made in the name of the licensed electrical contractor doing the work.
What if wiring work starts before the permit is issued?
Section 11-9(B) doubles the permit fee for electrical work commenced before the permit is obtained.

Sources & Official References

Other rules in Murfreesboro

All Murfreesboro rules

Compare Murfreesboro to another location·View the Tennessee building safety overview

Get notified when Electrical Permits in Murfreesboro, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.