Skip to main content

Murfreesboro, TN Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Adopted code
2024 International Plumbing Code, including Appendix B
Residential plumbing
International Residential Code for 1-2 family dwellings and townhouses
Code agency
Building and Codes Department
Emergency repairs
Permit due within two working days
Maximum fine
$50.00 per violation, each day separate
Appeals
Construction Board of Adjustments and Appeals
Minimum air gap
Two inches

Summary

Murfreesboro requires plumbing work in the City, or work connected to the City water or sewerage systems, to meet the 2024 International Plumbing Code, including Appendix B, as amended in City Code § 23-2. One and two-family dwellings and townhouses up to three stories high follow the International Residential Code instead. The Building and Codes Department is the code agency, and a violation carries a fine of up to $50 per day.

All construction, installation, alteration, replacement, enlargement, repairs and maintenance of plumbing systems and system components within the City, or connected to the City water and/or sewerage systems, except those located in one and two-family dwellings and multiple single-family dwellings (townhouses) not more than three stories high with separate means of egress and their accessory structures, shall comply with the provisions of the 2024 International Plumbing Code, including Appendix B, published by the International Code Council, one copy of which has been filed and remains on file in the office of the City Recorder, is hereby adopted and approved and incorporated into this chapter as fully and effectually as if set out at length herein, except as specifically amended, modified or deleted in this chapter. All construction, installation, alteration, replacement, enlargement, repairs, and maintenance of plumbing systems and system components located in one and two-family dwellings ... shall comply with the provisions of the International Residential Code, as adopted and approved and incorporated into this chapter.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 18 Update 1).

Full Breakdown

City Code § 23-1 adopts the 2024 International Plumbing Code, with Appendix B, for all construction, installation, alteration, replacement, enlargement, repair and maintenance of plumbing systems and system components inside the City or connected to the City water and/or sewerage systems. A copy sits on file in the office of the City Recorder. The 2024 edition arrived through Ord. No. 26-O-34, adopted 9-3-26, which is the latest entry in the section's history line. Tennessee authorizes this kind of adoption by reference in T.C.A. § 6-54-502.

The split between the two codes turns on building type. Plumbing in one and two-family dwellings and in multiple single-family dwellings (townhouses) not more than three stories high with separate means of egress, plus their accessory structures, falls under the International Residential Code. Everything else, including commercial, institutional and larger multifamily buildings, falls under the International Plumbing Code.

Section 23-2 then rewrites parts of the model code for Murfreesboro. Section 103.1 names the Building and Codes Department as the agency. Section 105.2 adds a permit exemption for emergency repairs: they can be made at night, on weekends and holidays, and during a natural disaster without a permit first, but a permit must be obtained within the next two working days unless the work type is exempt. Section 108.2 hands permit fees to the City Council, and Section 108.6 has the Council adopt the refund policy. Under Section 108.4, the Chief Building Official can waive the doubling of the established fee for work started before a permit when the applicant shows good cause.

Technical changes are specific. Pipe must be placed on No. 67 bedding with at least six inches of No. 67 stone over the top (Section 306.3). Hot or tempered water supply to fixtures moves from 50 feet to 100 feet (Section 607.2). The minimum air gap is two inches (Sections 608.16.1 and 802.3.1). Roof extensions are six inches (Section 903.1.1). Restaurants, institutional indoor commercial kitchens, and food wholesalers or retailers may not use garbage disposals, and grease interceptors must be a type, capacity and location approved by the Murfreesboro Water Resources Department. Wastewater above 150 degrees Fahrenheit is prohibited (Section 702.5).

Commercial buildings can install re-purified water systems only for water closets, toilets and urinals. The permit goes through the Chief Building Official, but no permit issues without the written approval of the Director of the Murfreesboro Water Resources Department, and the piping must be purple and labeled "NON-POTABLE - DO NOT DRINK" at no more than four feet apart.

Violations & Fines

Section 23-4 punishes any violation of the International Plumbing Code, or any failure to comply with it, with a fine not exceeding $50.00. Constructing, installing, altering, replacing, enlarging or repairing a plumbing system in violation of the Code counts. Each violation and each day of the violation is a separate offense, and the fine is on top of recovery of costs, which the violator also owes. Starting work before a permit exposes the applicant to the doubled fee under Section 108.4.

Frequently Asked Questions

Which plumbing code applies to my Murfreesboro building?
Commercial and other buildings outside the residential category follow the 2024 International Plumbing Code, including Appendix B. One and two-family dwellings and townhouses not more than three stories high with separate means of egress, along with their accessory structures, follow the International Residential Code. Both are adopted in City Code § 23-1 and amended by § 23-2.
Can a plumber fix an emergency leak before getting a permit?
Yes. Section 105.2 as amended by § 23-2 allows emergency repairs at night, on weekends and holidays, and during a natural disaster without first obtaining a permit. The permit must be obtained within the next two working days, unless the type of work is exempt from a permit anyway.
Who sets plumbing permit fees and refunds in Murfreesboro?
The City Council. Section 108.2 says permit fees shall be set by the City Council, and Section 108.6 says the City Council shall adopt a policy governing refunds of permit fees. If work begins before a permit, the Chief Building Official can waive the doubled fee when the applicant shows good cause.
How do I appeal a plumbing decision by the Chief Building Official?
The Construction Board of Adjustments and Appeals hears appeals of any order, decision or determination of the Chief Building Official on applying or interpreting the plumbing code, following the procedures in City Code § 7-16. Variances to the backflow and back-siphonage requirements go to the Murfreesboro Water Resources Board instead.
What is the penalty for violating the plumbing code?
Section 23-4 sets a fine not exceeding $50.00 for violating any provision of the International Plumbing Code or failing to comply with it. Each violation and each day of the violation is a separate offense, and the violator also owes the recovery of costs.

Sources & Official References

Other rules in Murfreesboro

All Murfreesboro rules

Compare Murfreesboro to another location·View the Tennessee building safety overview

Get notified when Plumbing Permits in Murfreesboro, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.