Ontario, CA Building Safety: Electrical Permits (2026)
Key Facts
- Code adopted
- 2025 CA Electrical Code, Title 24 Pt. 3
- Latest amendment
- Ord. 3321, eff. Feb 2026
- Fees
- Set by City Council resolution
- Enforcement
- Sec. 8-6.02 penalties
- Related trigger
- Retrofit windows need permit (Sec. 8-5.02)
Summary
Ontario enforces the 2025 California Electrical Code (Title 24, Part 3) by reference under Municipal Code Section 8-4.01, making it the governing standard for wiring, panel, and circuit work permitted citywide. A copy is on file at the City Clerk's office, and permit fees are set separately by City Council resolution.
The 2025 Edition of the California Electrical Code, as adopted by the California Building Standards Commission in California Code of Regulations Title 24, Part 3, is hereby adopted by reference and made a part of this chapter as if fully set forth at length herein. One (1) copy of said code is on file in the office of the City Clerk for public review.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-32: Current through Ordinance 3338, passed 7-21-2026).
Full Breakdown
01, with a copy kept on file at the City Clerk's office for public review. The adoption ordinance chain runs back to 1990 and was most recently amended by Ordinance 3321, effective February 2026, updating the City to the current statewide triennial code cycle. Because the Electrical Code is adopted wholesale, any wiring, service upgrade, panel replacement, or new circuit installation the state code classifies as needing a permit needs one issued through Ontario's Building Department; there is no separate city-only carve-out the way there is for freestanding walls under the Building Code chapter.
01 rather than written into the code text, so the current fee schedule must be checked with the Building Department. 02, amending the Residential Code, requires a building permit for retrofit window replacements and requires the replacement windows to meet 2025 emergency-egress standards, showing that a permit obligation can attach even to work that looks cosmetic once life-safety requirements are triggered.
Violations & Fines
Section 8-6.02 makes any violation of a code adopted under Title 8, including performing electrical work without a required permit, subject to any or all penalties provided elsewhere in the Ontario Municipal Code or under applicable law. Unpermitted electrical work found during an inspection can require the wiring to be exposed for inspection and a permit obtained retroactively before the City approves the installation.
Frequently Asked Questions
Do I need a permit to add a new circuit or subpanel in Ontario?
What electrical code edition does Ontario currently enforce?
What happens if electrical work is done without a permit in Ontario?
Sources & Official References
Other rules in Ontario
California rules heatmap·Compare Ontario to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in San Bernardino County handle electrical permits.