Oxnard, CA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2025 CEC incorporating 2023 NEC
- Governing sections
- Sec. 14-11, Sec. 14-12
- Enforcement
- Building and Engineering Division, Article II
- Fire pump rule
- Onsite generator required as backup power
- Permit fees
- Set under Sec. 14-3(F) schedule
Summary
Oxnard adopts the 2025 California Electrical Code, which incorporates the 2023 National Electrical Code, by reference under Sec. 14-11, and folds its administration into the same Building and Engineering Division that runs the Building Code under Chapter 14, Article II. A local amendment adds backup-power rules for electric fire pumps.
SEC. 14-11. CALIFORNIA ELECTRICAL CODE ADOPTED. The third part of twelve parts of the California Code of Regulations, Title 24, known as the California Electrical Code ("CEC"), 2025 Edition, which incorporates by reference the National Electrical Code ("NEC"), 2023 Edition, ... is hereby adopted by reference, subject to the amendments hereinafter set forth. SEC. 14-12. AMENDMENTS. (B) Article 695.3: Amend Article 695.3 to read as follows: Article 695.3. Power Source(s) for Electric Motor-Driven Fire Pumps. Electric motor-driven fire pumps shall have a reliable source of power. Power provided by the local serving utility company shall only be considered a reliable source of power where an onsite generator is provided as an alternate source of power.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Contains Supplement current through 1-26-2026).
Full Breakdown
Sec. 14-11 of the Oxnard Code of Ordinances adopts the third part of twelve parts of the California Code of Regulations, Title 24, known as the California Electrical Code, 2025 Edition, which incorporates by reference the National Electrical Code, 2023 Edition, as published by the Building Standards Commission, subject to the amendments that follow in Sec. 14-12. Sec. 14-12(A) folds the electrical code's permitting and enforcement entirely into the Building Code chapter: new Article 90-10 states that the legal jurisdiction and administration of the electrical code is regulated by the administrative sections adopted in Chapter 14, Article II of the Oxnard City Code, meaning the same Building and Engineering Division created in Sec.
14-3(B), and the same permit-application, fee-schedule and 180-day abandonment rules in Sec. 14-3, govern electrical permits rather than a separate electrical permitting scheme. Sec. 3 for electric motor-driven fire pumps, requiring a reliable source of power and stating that power provided by the local serving utility company is only considered reliable where an onsite generator is provided as an alternate source, so a fire pump on utility power alone does not satisfy the code unless the building also has an onsite generator as backup. Electrical permit fees are drawn from the same Sec. 14-3(F) schedule that covers building, gas, mechanical and plumbing permits, adopted by City Council resolution or ordinance.
Violations & Fines
Performing electrical work that requires a permit without one, or installing a fire pump without the required reliable backup power source, is a code violation under Sec. 1-10: a general misdemeanor with up to a $1,000 fine and six months in jail, or an infraction from $100 to $500 across repeat violations of the same section within a year, each day counted separately.
Frequently Asked Questions
Does Oxnard use its own electrical permitting office?
What electrical code edition applies to Oxnard construction?
Can a fire pump run on utility power alone in Oxnard?
Sources & Official References
Other rules in Oxnard
California rules heatmap·Compare Oxnard to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Ventura County handle electrical permits.