Skip to main content
CityRuleLookup

Wayne County, IN Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
Indiana Electrical Code (Art. 17, I.A.C. Title 675)
Electrical permit fee
$35
Mobile homes
Improvement location + electrical + plumbing permits only
Permit needed for
New wiring, rewiring, circuit or service changes
Enforcing officer
Building Commissioner
Unpermitted work
Fee doubled, plus $100-$1,000/day fine

Summary

Wayne County adopts the Indiana Electrical Code by reference under Article 17 of the state's building rules and requires a separate electrical permit from the Building Commissioner for any wiring installation, alteration, extension or replacement, and for any new or relocated permanent electrical service, in unincorporated Wayne County, Indiana.

These county ordinances apply to unincorporated areas of Wayne County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

§ 151.05 ADOPTION OF RULES BY REFERENCE. ... (A) Building rules of the Indiana Fire Prevention and Building Safety Commission as set out in the following articles of I.A.C. Title 675 are hereby incorporated by reference in this chapter and shall include later amendments to those articles as the same are published in the Indiana Register of the Indiana Administrative Code, with effective dates as fixed therein: ... (4) Article 17 - Electrical Codes: (a) Indiana Electrical Code; and (b) Safety Code for Health Care Facilities. ... § 151.06 PERMITS REQUIRED. (A) Permits shall be obtained from the office of the Building Commissioner prior to the commencement of work in the following instances. ... (2) Electrical permit. (a) The installation, alteration, extension or replacement of electrical wiring, including wiring for additional circuits, rewiring and circuit replacement; and (b) The installation, relocation or replacement of any permanent electrical service.

Full Breakdown

Section 151.05(A)(4) incorporates the Indiana Electrical Code, along with the Safety Code for Health Care Facilities, by reference under Article 17 of I.A.C. Title 675, including all later published amendments with their fixed effective dates; copies are kept on file with the Building Commissioner under subsection (B). Section 151.06(A)(2) then requires an electrical permit from the Building Commissioner's office before beginning the installation, alteration, extension or replacement of electrical wiring, including additional circuits, rewiring and circuit replacement, and before installing, relocating or replacing any permanent electrical service.

The fee schedule in § 151.09 sets a flat $35 electrical permit fee, separate from the $35 plumbing permit and the variable building-permit fees; notably, mobile homes require only an improvement location permit, an electrical permit and a plumbing permit, with no building permit issued for them at all. Under § 151.10's inspection schedule, electrical work must be roughed in and visible at the framing inspection, before drywall or insulation covers it, and re-inspection fees apply if work is not ready when an inspector arrives.

Like other permits under this chapter, an electrical permit expires one year from issuance under § 151.06(B), with one free six-month extension available under § 151.07. Violating the permit requirement falls under the same enforcement scheme as the rest of Chapter 151: a fine of $100 to $1,000 per day under § 151.99, and a doubled permit fee under § 151.09 for work started before the permit issued.

Violations & Fines

Installing, altering, extending or replacing wiring or a permanent electrical service without the § 151.06(A)(2) permit violates Chapter 151 and draws a $100 to $1,000 fine per day under § 151.99. Starting electrical work before the permit issues doubles the $35 permit fee under § 151.09, and covering wiring before the framing inspection can require costly rework.

Frequently Asked Questions

What electrical code applies in unincorporated Wayne County, Indiana?
Section 151.05(A)(4) adopts the Indiana Electrical Code by reference, as published under Article 17 of I.A.C. Title 675, including all later amendments with their fixed effective dates, alongside the Safety Code for Health Care Facilities.
When do I need an electrical permit in Wayne County?
Section 151.06(A)(2) requires a permit before installing, altering, extending or replacing electrical wiring, including additional circuits and rewiring, and before installing, relocating or replacing any permanent electrical service. The permit fee is $35 under § 151.09.
Do manufactured or mobile homes need a full building permit for electrical work?
No building permit is issued for mobile homes at all; the fee schedule in § 151.09 states mobile homes require only an improvement location permit, an electrical permit and a plumbing permit, so the electrical permit still applies even though the building permit does not.

Sources & Official References

Other rules in Wayne County

All Wayne County rules

Compare Wayne County to another location·View the Indiana building safety overview

Get notified when Electrical Permits in Wayne County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.