Livermore, CA Building Safety: Green Building Code (2026)
Key Facts
- Governing code
- LMC Ch. 15.26, adopts Title 24 GBSC 2025 Ed.
- All-electric mandate
- New construction, § 15.26.170
- 1-2 family EV space
- One Level 2 EV Ready space per unit
- Multifamily EVCS quota
- 15% EVCS + 85% Low Power Level 2
- Office EVCS quota
- 20% EVCS, 30% EV Capable
- Alt. compliance path
- LEED or GreenPoint Rating equivalency
Summary
Livermore adopts the 2025 California Green Building Standards Code (Title 24) by reference under LMC Chapter 15.26, then layers on local amendments covering EV charging infrastructure and all-electric construction. New buildings must meet local EV-ready parking quotas, and all newly constructed buildings must be all-electric unless a specific exception applies.
New construction: All newly constructed buildings shall be all-electric buildings. Building additions, alterations, repairs, and tenant improvements shall not be considered new construction. The final determination whether a project meets the definition of new construction shall be made by the local enforcing agency.
Full Breakdown
26 of the Livermore Municipal Code adopts the Green Building Standards Code, 2025 Edition (Title 24 of the California Code of Regulations), and amends it with locally-specific standards administered by the Community Development Director. 050). 170, which requires that all newly constructed buildings be all-electric buildings, meaning no combustion equipment or plumbing for combustion equipment for space heating, water heating, cooking or clothes drying. Exceptions exist for multifamily projects with entitlements approved before the effective date (which may install fuel gas for shared water heating), accessory dwelling units built on a lot with an existing gas-fueled residence, buildings lacking a feasible all-electric compliance pathway under the Building Energy Efficiency Standards, and non-combustion fuel cells.
180 requires the construction drawings to show reserved electrical capacity, labeled conduit and circuit breakers, and physical space for a future electric heating appliance, certified by a design professional or licensed electrical contractor. 090). 210).
Violations & Fines
Noncompliant new construction cannot obtain a certificate of occupancy from the Building and Safety Division until the required all-electric infrastructure, EV-ready wiring, or approved equivalency certification is documented. The Community Development Director determines whether a project qualifies as "new construction" versus an addition, alteration or tenant improvement, and can require a registered design professional's certification before granting a modification exception under § 15.26.170.
Frequently Asked Questions
Can a new Livermore house still be built with a gas furnace?
How many EV charging spaces does a new Livermore apartment building need?
Can a project use LEED instead of Livermore's Green Building Standards Code?
Sources & Official References
Other rules in Livermore
California rules heatmap·Compare Livermore to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Green Building Code in Nearby Cities
How other cities in Alameda County handle green building code.