Corona, CA Building Safety: Building Inspections (2026)
Key Facts
- Roof sheathing/shear inspection
- After sheathing and shear panels are secured
- Plaster inspection
- After the scratch coat is applied
- Reinspection fee
- Charged per adopted fee schedule for failed work
- Certificate of occupancy
- Withheld until all city fees are paid
- Appeals
- Filed under Chapter 1.09, Section 113 process
Summary
Corona's Building Code amendments spell out specific inspection points for framing and finish work, add a reinspection fee when a job fails, and hold a certificate of occupancy until fees are paid. Section 15.02.170 sets roof sheathing/shear and plaster inspection triggers; Section 110.7 covers reinspections; enforcement runs through the Title 15 violation-penalty section.
Section 110.3 is amended by adding the following subsections 110.3.3.1 and 110.3.6.1 thereto to read as follows: "110.3.3.1. Roof Sheathing and Shear Inspection. Roof sheathing and shear inspections shall be performed after roof sheathing and all structural shear panels or walls are in place and secured by nailing or other approved methods. 110.3.6.1. Plaster Inspection. Plaster inspections shall be performed after the application of the scratch coat."
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-56: Supplement contains: Local legislation passed through Ord. 3423, passed 12-3-2025).
Full Breakdown
Corona's Building Code amendments, codified at Corona Municipal Code Chapter 15.02, layer city-specific inspection requirements onto the adopted California Building Code. Section 15.02.170 adds two required inspection points: a roof sheathing and shear inspection performed after roof sheathing and all structural shear panels or walls are in place and secured by nailing or other approved methods (new Section 110.3.3.1), and a plaster inspection performed after application of the scratch coat (new Section 110.3.6.1). These sit alongside the base Building Code's foundation, framing and other required inspection stages.
Section 15.02.180 adds Section 110.7, letting the Building Official charge a reinspection fee, set by the adopted fee schedule, whenever a called inspection finds the work incomplete or previously ordered corrections still not made; the fee also applies if the inspection card is not posted on site, approved plans are unavailable to the inspector, or the contractor deviates from approved plans. The first rejection for a code failure does not itself trigger the fee. Once inspections are complete, Section 15.02.190 amends Section 111.2 so no certificate of occupancy issues until all applicable city fees are paid. Disputes over an inspector's or Building Official's interpretation go through the Section 113 appeals process under Corona Municipal Code Chapter 1.09, where the hearing officer can only decide whether the code was correctly interpreted, not waive its requirements.
Violations & Fines
Ignoring the inspection process invites a reinspection fee under Section 110.7 and delays occupancy, since Section 111.2 blocks a certificate of occupancy until every city fee is paid. Beyond inspection fees, Section 15.02.200 makes any violation of the Title 15 building regulations an infraction, punishable per day under Chapter 15.70, while defying a stop-work order under the adopted Building Code is a misdemeanor.
Frequently Asked Questions
What inspection stages does Corona add to the standard Building Code?
What happens if my Corona building inspection fails?
Can I get a certificate of occupancy before paying city fees?
Sources & Official References
Other rules in Corona
California rules heatmap·Compare Corona to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Inspections in Nearby Cities
How other cities in Riverside County handle building inspections.