Key Facts
- Inspection stages
- 13 stages, § 110.3.1 through 110.3.13
- First stage
- Footing and foundation inspection
- Last stage
- Final inspection after all permitted work
- Fire inspections
- Made by fire official or designee
- Penalty
- Up to $500 per offense (§ 4-104)
Summary
The City of Louisburg's Building Official runs building projects through a set sequence of inspections under § 4-102's amendment to Section 110.3 of the 2018 International Building Code, starting with footings and foundation and ending with a final inspection once all permitted work is done. Each stage must be requested and approved before construction covers up the work it checks.
Required inspections. ... The building official, upon notification, shall make the inspections set forth in Sections 110.3.1 through 110.3.13. 110.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. ... 110.3.12 Final inspection. The final inspection shall be made after all work required by the building permit is completed.
Full Breakdown
Section 110.3, as amended for the City of Louisburg by § 4-102, lists thirteen numbered inspection stages the Building Official must make on notification from the contractor or owner. Work starts with 110.3.1, footing and foundation inspection, made after excavation is complete and reinforcing steel is in place, and 110.3.2, concrete slab and under-floor inspection, made before concrete is poured or subfloor sheathing goes down. Framing gets its own step at 110.3.4, done after the roof deck, framing, fireblocking, and bracing are up and rough electrical, plumbing, and mechanical work is approved, followed by lath and gypsum board inspection at 110.3.5 and a check on weather-exposed balcony waterproofing at 110.3.6 before those surfaces are concealed.
Fire- and smoke-resistant penetrations get inspected at 110.3.7 before they are covered, energy-efficiency items such as insulation R-values and duct R-values can be checked at 110.3.8, and 110.3.11 adds a fire protection systems inspection that the fire official or a designee performs. Special inspections required under IBC Chapter 17 are tracked separately at 110.3.10. The process ends at 110.3.12, the final inspection, made only after every piece of work required by the building permit is complete, and for property in a mapped flood hazard area, 110.3.13 adds a requirement to document the lowest floor elevation before that final sign-off.
Violations & Fines
Covering up framing, foundations, or other work before the required inspection stage is approved, or occupying a building before its final inspection under 110.3.12, is treated as a violation of Article 1, Chapter 4. Under City Code § 4-104, that carries a fine of up to $500 per offense, and the Building Inspector or City Attorney may seek an injunction or other court action to address work performed out of sequence.
Frequently Asked Questions
What is the first inspection on a Louisburg building permit?
When is the final inspection done?
Who inspects fire protection systems in Louisburg?
Sources & Official References
Other rules in Louisburg
Compare Louisburg to another location·View the Kansas building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.