Key Facts
- Certificate of inspection fee
- $75 (MSBC 108.5.1)
- Reinspection fee
- $50 per inspection
- Missed final-inspection call
- $25 (within 10 working days)
- Fee schedule location
- Appendix A, Sec. 10-35
Summary
Medford charges $75 for a certificate of inspection under Section 108.5.1 of the Massachusetts State Building Code, plus a $50 reinspection fee whenever a job isn't ready or fails, under the Appendix A fee schedule tied to Sec. 10-35. Missing the final inspection call within ten working days after finishing work adds a separate $25 charge.
Sec. 10-35. - Building permit and inspection fees. The building permit and inspection fees are included in appendix A of these Revised Ordinances. ... (a) Schedule of Building Fees: 10-35 ... (5) Certificate of inspection per 108.5.1 of Massachusetts State Building Code ..... 75.00 ... (6) Reinspection fee . ... . 50.00 ... (9) Failure to call for final inspection within ten working days after completion . ... . 25.00 ... (11) Reinspection fee, per inspection . ... . 50.00
Full Breakdown
Medford's building inspection charges live in the same Appendix A schedule that Sec. 10-35 points to for permit fees, but they attach to distinct stages of a project. A certificate of inspection under Section 108.5.1 of the Massachusetts State Building Code costs $75.00, a separate line from the base permit fee. Once construction is underway, a $50.00 reinspection fee applies, listed twice in the schedule as items (6) and (11), covering any inspection that has to be repeated because the work was not ready or was done incorrectly.
Contractors also face a distinct $25.00 charge under item (9) for failing to call for the final inspection within ten working days after finishing the job, a separate penalty from the reinspection fee and aimed specifically at closing out a project on time. Together, these three charges, the $75 certificate of inspection, the $50 reinspection fee, and the $25 late-final-inspection fee, function as Medford's way of billing for the actual labor of site visits and repeat visits, keeping the base permit fee tied only to plan review and initial issuance while every subsequent inspection stage carries its own cost recovery charge under the same Sec. 10-35 schedule.
Violations & Fines
Failing to schedule required inspections triggers its own charges under the Sec. 10-35 fee schedule: a $50.00 reinspection fee any time work isn't ready or was done incorrectly, and a separate $25.00 penalty for not calling for the final inspection within ten working days of finishing the job. A $75.00 certificate of inspection fee applies separately under Section 108.5.1 of the state building code.
Frequently Asked Questions
What does a Medford building inspection cost?
What happens if my Medford building inspection fails?
What if I forget to call for my final building inspection?
Sources & Official References
Other rules in Medford
Compare Medford to another location·View the Massachusetts building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.