Medford, MA Building Safety: Plumbing Permits (2026)
Key Facts
- Enforcement
- Building commissioner (Sec. 10-101)
- Inspector of plumbing
- Appointed under M.G.L.A. c. 142, § 11
- New residential work (up to 3 units)
- $125 for first five fixtures
- Additional fixture fee
- $15 each
- Reinspection fee
- $50, paid in advance
Summary
Medford's building commissioner, acting as ex officio inspector of buildings, enforces plumbing regulations under Sec. 10-101, while a separately appointed inspector of plumbing handles plumbing and gas fittings under Sec. 10-102 and M.G.L.A. c. 142, § 11. New residential plumbing work in a building of up to three units costs $125 for the first five fixtures under the Sec. 10-103 fee schedule in Appendix A.
Sec. 10-101. - Enforcement of plumbing regulations. The building commissioner, ex officio the inspector of buildings, shall have the responsibility for the enforcement of the regulations relating to plumbing. ... Sec. 10-102. - Plumbing and gas inspector. An inspector of plumbing shall be appointed in accordance with and subject to the provisions of M.G.L.A. c. 142, § 11. ... Sec. 10-103. - Permit and gas permit fees. The plumbing and gas permit fees are in the fee schedule in appendix A of these Revised Ordinances. ... (a) Plumbing permit fee schedule: 10-103 (1) New work—Residential (up to 3 dwelling units): a. First five fixtures ..... 125.00 b. Each additional fixtures or appurtenance ..... 15.00 ... (5) Reinspection fee for work not ready for inspection or done incorrectly, paid in advance ..... 50.00
Full Breakdown
Sec. 10-101 puts plumbing enforcement on the building commissioner, who acts ex officio as the inspector of buildings for this purpose. Sec. 10-102 layers on a distinct inspector of plumbing, appointed under M.G.L.A. c. 142, § 11, exercising the powers that statute sets out. Sec. 10-103 does not restate the fee amounts itself; it points instead to the Appendix A fee schedule, where item (a)(1) prices new residential plumbing work in a building of up to three dwelling units at $125.00 for the first five fixtures and $15.00 for every additional fixture or appurtenance.
Once a job is underway, item (5) of that same schedule adds a $50.00 reinspection fee, payable in advance, any time a plumbing job is not ready for inspection or was done incorrectly, so a contractor who calls for an inspection before the work is actually finished pays for the visit twice. The dual-inspector structure means a single plumbing job in Medford can draw oversight from both the building commissioner's office under Sec. 10-101 and the dedicated inspector of plumbing under Sec. 10-102, whose state-derived authority under M.G.L.A. c. 142, § 11 exists independently of the city's own building permitting chain.
Violations & Fines
Plumbing work that isn't ready when an inspector arrives, or that was done incorrectly, costs the contractor a $50.00 reinspection fee under item (5) of the Sec. 10-103 fee schedule, paid in advance before the do-over inspection. The building commissioner, enforcing under Sec. 10-101, and the separately appointed inspector of plumbing under Sec. 10-102 both have authority to act on plumbing violations citywide.
Frequently Asked Questions
Who enforces Medford's plumbing code?
How much is a Medford plumbing permit for a house?
What if my plumbing isn't ready when the inspector shows up?
Sources & Official References
Other rules in Medford
Compare Medford to another location·View the Massachusetts building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.