Gardena, CA Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2022 California Plumbing Code (Title 24, Part 5)
Adopted appendices
A, D, H and I only
Plan review fee
100% of permit fee
Refund window
written request within 180 days
No-work refund
up to 80% of permit fee

Summary

In the City of Gardena, plumbing work is governed by the 2022 California Plumbing Code, adopted by reference at § 15.16.010 along with only four of its appendices. Every plumbing permit fee is set by City Council resolution, and the plan-review fee equals 100 percent of the permit fee under § 15.16.020, with up to an 80 percent refund available if no work is done.

§ 15.16.010. Adoption of plumbing code. Except as may otherwise be provided in this title, the California Plumbing Code, 2022 Edition (Part 5 of Title 24 of the California Code of Regulations), including only Appendices A (Recommended Rules for Sizing the Water Supply System), D (Sizing Storm Water Drainage Systems), H (Private Sewage Disposal Systems), and I (Installation Standards), are hereby adopted by reference and made a part of this chapter as though set forth in full herein. ... ... § 15.16.020. Plumbing permit fees. Section 104.5 of the 2022 California Plumbing Code is hereby amended to read as follows and Sections 104.5.1 through 104.5.3 are of no force or effect: SECTION 104.5 FEES. A. Permit fees. The fee for each permit shall be as set forth in the latest resolution adopted by the City Council.

Full Breakdown

Gardena Municipal Code § 15.16.010 adopts the 2022 California Plumbing Code, Part 5 of Title 24 of the California Code of Regulations, as the plumbing code of the city, but limits the adoption to only four appendices: Appendix A for sizing the water supply system, Appendix D for sizing storm water drainage systems, Appendix H for private sewage disposal systems, and Appendix I for installation standards. Because Appendix H is one of the adopted appendices, any private sewage disposal system, such as a septic system on a parcel without sewer access, must meet that appendix's installation and siting standards as part of the same plumbing-permit process.

Section 15.16.020 amends the code's fee provision, Section 104.5, and disables Sections 104.5.1 through 104.5.3, replacing them with a rule that ties every plumbing permit fee to the latest resolution the City Council adopts, and sets the plan-review fee at 100 percent of that permit fee. The section also authorizes the Building Official to refund an erroneously collected fee in full, to refund up to 80 percent of a permit fee when no work has been done under a permit, and to refund up to 80 percent of a plan-review fee when an application is withdrawn or canceled before review starts, provided the refund request is filed in writing within 180 days of the fee payment.

Violations & Fines

Plumbing work performed without the required permit, or work that proceeds under an appendix H private sewage system that does not meet the adopted installation standards, is enforceable as a Building Code violation under § 15.06.050 and § 1.16.010, punishable as a misdemeanor with a fine up to $1,000 and up to six months in jail, or as a graduated infraction with fines up to $1,000 for repeat local building-code violations within a year; work started before the permit issues is also subject to the quadrupled fee method set in § 15.06.040(B).

Frequently Asked Questions

What plumbing code does Gardena use?
The 2022 California Plumbing Code, Part 5 of Title 24, adopted at § 15.16.010, but the city only adopted four of its appendices: A (water supply sizing), D (storm drainage sizing), H (private sewage disposal) and I (installation standards).
How is a Gardena plumbing permit fee calculated?
Section 15.16.020 sets the permit fee by the latest City Council resolution and fixes the plan-review fee at 100 percent of that permit fee, replacing the state code's own fee schedule in Section 104.5 entirely.
Can I get a refund on a Gardena plumbing permit I never used?
Yes, up to 80 percent of the permit fee if no work was done, or up to 80 percent of the plan-review fee if you withdraw before review starts, but the Building Official needs your written refund request within 180 days of paying the fee.

Sources & Official References

Other rules in Gardena

All Gardena rules

California rules heatmap·Compare Gardena to another location·View the California building safety overview

Get notified when Plumbing Permits in Gardena, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Los Angeles County handle plumbing permits.

Downey, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Long Beach, CA
Some Restrictions
Carson, CA
Some Restrictions
Compton, CA
Some Restrictions
Los Angeles, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions