Skip to main content
CityRuleLookup

Gardena, CA Building Safety: Green Building Code (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2022 CALGreen (Title 24, Part 11)
Local amendments
none; state edition adopted unqualified
Adopting ordinance
Ord. No. 1851 § 10, 2023
Review path
Building Division, same plan-review fee

Summary

In the City of Gardena, every covered construction project must comply with CALGreen, the 2022 edition of the California Green Building Standards Code, Part 11 of Title 24, adopted by reference in full at § 15.24.010. The city adopted no local amendments to the sustainability chapter, so the state edition's mandatory measures for water use, waste diversion and building commissioning apply exactly as the state wrote them.

Chapter 15.24. GREEN BUILDING STANDARDS § 15.24.010. Adoption of CALGreen code. Except as may otherwise be provided in this title, the California Green Building Standards Code (referred to herein as "CALGreen"), 2022 Edition (Part 11 of Title 24 of the California Code of Regulations), is hereby adopted by reference and made a part of this chapter as though set forth in full herein. These provisions of Title 24, Part 11 shall comprise the CalGreen code of the city of Gardena.

Full Breakdown

Gardena Municipal Code § 15.24.010 adopts the 2022 California Green Building Standards Code, referred to in the code as CALGreen, Part 11 of Title 24 of the California Code of Regulations, by reference and makes it part of Chapter 15.24 as though set forth in full. Unlike the city's building, residential, electrical and plumbing code chapters, which each amend specific state sections on fees, permit exemptions or local infrastructure, Chapter 15.24 contains no additional local amendment sections beyond the adoption itself; the ordinance history note attached to the section, Ordinance No.

1851 § 10, 2023, shows the city readopted the current edition alongside the rest of its Title 15 building-code package that year rather than layering city-specific CALGreen provisions on top of it. Because the adoption is unqualified, every mandatory CALGreen measure for the 2022 edition, including construction waste management, water-efficient plumbing fixtures, and building commissioning for larger structures, applies to permitted projects in Gardena exactly as the state code prints it, and compliance is checked by the same Building Division that reviews the rest of a project's Title 15 permit package under the fee and appeal procedures set out earlier in that title.

A project's CALGreen checklist is reviewed alongside its building, electrical, mechanical and plumbing plan sets under the single plan-review fee described at § 15.06.040, so a separate CALGreen-specific fee is not charged.

Violations & Fines

Constructing a project without meeting the mandatory CALGreen measures the Building Official finds applicable is treated the same as any other Title 15 building-code violation: it is unlawful under § 15.06.050 (amended CBC Section 114) and § 1.16.010, chargeable as a misdemeanor with a fine up to $1,000 and up to six months in jail, or as a graduated infraction with fines rising to $1,000 for repeat local building-and-safety-code violations within a year, and the Building Official can withhold a certificate of occupancy until the required green-building measures are verified.

Frequently Asked Questions

Does Gardena require CALGreen compliance on building permits?
Yes. Section 15.24.010 adopts the 2022 California Green Building Standards Code, CALGreen, Part 11 of Title 24, by reference and in full, so every mandatory measure in that edition applies to permitted construction in the city exactly as the state wrote it.
Did Gardena add its own local amendments to CALGreen?
No. Unlike its building, residential, electrical and plumbing code chapters, Chapter 15.24 contains only the single adoption section, § 15.24.010, readopted with Ordinance No. 1851 § 10 in 2023, with no city-specific CALGreen amendments layered on top.
Is there a separate fee for CALGreen review in Gardena?
No. CALGreen compliance is checked as part of the same Building Division plan review that covers a project's building, electrical, mechanical and plumbing plan sets, under the single plan-review fee set at § 15.06.040.

Sources & Official References

Other rules in Gardena

All Gardena rules

California rules heatmap·Compare Gardena to another location·View the California building safety overview

Get notified when Green Building Code in Gardena, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Green Building Code in Nearby Cities

How other cities in Los Angeles County handle green building code.

South Gate, CA
Light Restrictions
Downey, CA
Some Restrictions
El Monte, CA
Some Restrictions
Long Beach, CA
Some Restrictions
Carson, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions
Pasadena, CA
Some Restrictions
Palmdale, CA
Some Restrictions