Gardena, CA Building Safety: Green Building Code (2026)
Key Facts
- Adopted code
- 2022 CALGreen (Title 24, Part 11)
- Local amendments
- none; state edition adopted unqualified
- Adopting ordinance
- Ord. No. 1851 § 10, 2023
- Review path
- Building Division, same plan-review fee
Summary
In the City of Gardena, every covered construction project must comply with CALGreen, the 2022 edition of the California Green Building Standards Code, Part 11 of Title 24, adopted by reference in full at § 15.24.010. The city adopted no local amendments to the sustainability chapter, so the state edition's mandatory measures for water use, waste diversion and building commissioning apply exactly as the state wrote them.
Chapter 15.24. GREEN BUILDING STANDARDS § 15.24.010. Adoption of CALGreen code. Except as may otherwise be provided in this title, the California Green Building Standards Code (referred to herein as "CALGreen"), 2022 Edition (Part 11 of Title 24 of the California Code of Regulations), is hereby adopted by reference and made a part of this chapter as though set forth in full herein. These provisions of Title 24, Part 11 shall comprise the CalGreen code of the city of Gardena.
Full Breakdown
Gardena Municipal Code § 15.24.010 adopts the 2022 California Green Building Standards Code, referred to in the code as CALGreen, Part 11 of Title 24 of the California Code of Regulations, by reference and makes it part of Chapter 15.24 as though set forth in full. Unlike the city's building, residential, electrical and plumbing code chapters, which each amend specific state sections on fees, permit exemptions or local infrastructure, Chapter 15.24 contains no additional local amendment sections beyond the adoption itself; the ordinance history note attached to the section, Ordinance No.
1851 § 10, 2023, shows the city readopted the current edition alongside the rest of its Title 15 building-code package that year rather than layering city-specific CALGreen provisions on top of it. Because the adoption is unqualified, every mandatory CALGreen measure for the 2022 edition, including construction waste management, water-efficient plumbing fixtures, and building commissioning for larger structures, applies to permitted projects in Gardena exactly as the state code prints it, and compliance is checked by the same Building Division that reviews the rest of a project's Title 15 permit package under the fee and appeal procedures set out earlier in that title.
A project's CALGreen checklist is reviewed alongside its building, electrical, mechanical and plumbing plan sets under the single plan-review fee described at § 15.06.040, so a separate CALGreen-specific fee is not charged.
Violations & Fines
Constructing a project without meeting the mandatory CALGreen measures the Building Official finds applicable is treated the same as any other Title 15 building-code violation: it is unlawful under § 15.06.050 (amended CBC Section 114) and § 1.16.010, chargeable as a misdemeanor with a fine up to $1,000 and up to six months in jail, or as a graduated infraction with fines rising to $1,000 for repeat local building-and-safety-code violations within a year, and the Building Official can withhold a certificate of occupancy until the required green-building measures are verified.
Frequently Asked Questions
Does Gardena require CALGreen compliance on building permits?
Did Gardena add its own local amendments to CALGreen?
Is there a separate fee for CALGreen review in Gardena?
Sources & Official References
Other rules in Gardena
California rules heatmap·Compare Gardena to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Green Building Code in Nearby Cities
How other cities in Los Angeles County handle green building code.