Hempstead, NY Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Hempstead Code § 86-10A
Approval needed
Plumbing Inspector must approve application
Separate permits
Required for water supply and gas piping
Work start deadline
90 days after issuance
Completion deadline
1 year, extendable to 2 years total
First offense penalty
$500 to $2,500 or up to 15 days jail

Summary

No plumbing, drainage or sewage disposal work may begin in unincorporated Hempstead without a permit from the Department of Buildings under § 86-10A. The rule covers new installations, alterations, extensions, and any rehabilitation, reconstruction or replacement of an existing sewage disposal system, and it stays unlawful to maintain that work without a duly issued permit.

A person, firm or corporation shall not install or cause to be installed any new plumbing or drainage work in a building or structure, or extend or alter or cause to be extended or altered any existing plumbing, or install a new sewage disposal system, or alter, rehabilitate, reconstruct or replace an existing sewage disposal system without first obtaining a permit from the Department of Buildings for such work. All requirements pertaining to plumbing and drainage, as prescribed by this chapter, shall be applicable to sewage disposal systems, unless otherwise specified or as may be determined by the Commissioner of Buildings.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4863878; v67 updated 2026-04-28; through 04-28-2026).

Full Breakdown

Beyond drainage and sewage work, § 86-10B requires a permit before any water may be supplied to or used in a building, structure or parcel within the Town's building lines, and § 86-10C requires a separate permit for installing gas supply piping from a meter to a consumer's appliance. No plumbing permit issues until a Plumbing Inspector approves the application, under § 86-12E. Once granted, a plumbing permit follows the same timing rules as a building permit: work must start within 90 days and finish within one year, or the project is deemed abandoned, per § 86-13A and C, with supplementary permits available for extensions up to two years total.

After the work is done, the property owner needs a certificate of approval of the plumbing or drainage work under § 86-20; maintaining plumbing work for more than a year without that certificate, absent a supplementary permit extending time, is itself unlawful under § 86-20A. The Town Board appoints a five-member Plumbers' Examining Board, chaired by one of its members, to oversee plumbing licensing standards under § 86-31. Like building-permit applications, plumbing applications are filed with the Building Inspector on Town-issued forms and must describe the work in enough detail for the Department to confirm compliance with the plumbing and drainage requirements of this chapter.

Violations & Fines

Installing or maintaining plumbing, drainage, water or gas-supply work without the required permit violates Chapter 86 and is punishable under § 86-25B: $500 to $2,500 or up to 15 days in jail for a first offense, $1,500 to $5,000 for a second offense within five years, and $3,000 to $10,000 for a third offense within five years, with each day of continued violation charged as a separate offense.

Frequently Asked Questions

Do I need a separate permit to run a new gas line in Hempstead?
Yes. Section 86-10C requires anyone installing pipe to supply gas from a meter or source of supply to a consumer's appliance to secure a permit first, separate from any general plumbing permit for drainage or sewage work.
Who has to approve my plumbing application before I get a permit?
A Plumbing Inspector must approve the application before the Building Inspector can issue the permit. Section 86-12E states no permit for plumbing or drainage work shall be issued unless and until the application has been approved by a Plumbing Inspector.
How long is a Hempstead plumbing permit good for?
The same clock as a building permit applies: work must start within 90 days of issuance under § 86-13A, and the job must be finished within one year or it is deemed abandoned, with supplementary permits available to extend completion up to two years total under § 86-13C.
What if I finish plumbing work but never get the final sign-off?
That is a separate violation. Section 86-20A makes it unlawful to maintain plumbing or drainage work performed under a permit for more than a year without a certificate of approval of that work, unless a supplementary permit extending the completion time has been issued.

Sources & Official References

Other rules in Hempstead

All Hempstead rules

New York rules heatmap·Compare Hempstead to another location·View the New York building safety overview

Get notified when Plumbing Permits in Hempstead, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.