Jackson, TN Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- 2018 International Plumbing Code, Third Printing
- Enforcing agency
- Department of Building and Housing Codes
- Appeal deadline
- 90 days from the official's decision
- Appeal board
- 13-member code advisory/appeals board, § 12-103
- Violation
- Misdemeanor under § 12-106, general penalty provision
- Address posting
- Required on-site before work begins, § 12-105
Summary
In the City of Jackson, Tennessee, every plumbing installation, repair or alteration in a building or structure must comply with the 2018 International Plumbing Code, which the city council adopted by reference under Jackson Municipal Code § 12-501. The Department of Building and Housing Codes administers permits and inspections, and anyone working without one risks a misdemeanor charge under § 12-106.
12-106. - Misdemeanor to violate codes. Any person, who shall violate any provision of the codes adopted in this chapter, or fail to comply therewith, or with any of the requirements thereof, or who shall erect, construct, alter, demolish or move any structure, or who has erected, constructed, altered, repaired, moved or demolished a building or structure in violation of a detailed statement or drawing submitted and approved thereunder, shall be guilty of a misdemeanor and shall be punished in accordance with the general penalty provision of this municipal code of ordinances. ... 12-501. - Adopted. Pursuant to the authority granted by Tennessee Code Annotated, § 6-54-502 et seq., the 2018 edition of the International Plumbing Code (Third Printing), excluding all appendices thereto, as prepared and adopted by the International Code Congress International, Inc., is hereby adopted by reference and incorporated in this code of ordinances.
Full Breakdown
Jackson Municipal Code § 12-501 adopts the 2018 edition of the International Plumbing Code (Third Printing), excluding its appendices, under authority granted by Tennessee Code Annotated § 6-54-502 et seq. The adoption sits in Title 12, Chapter 5, alongside the city's parallel adoptions of the 2018 International Building, Electrical, Fuel Gas, Mechanical, Property Maintenance and Existing Building Codes, so a plumbing permit runs through the same Department of Building and Housing Codes that issues every other construction permit. Section 12-202 sets fees for the adopted construction codes by a schedule the city council approves and revises by resolution rather than printing a dollar figure in the ordinance itself, so contractors confirm current plumbing permit fees with the department before bidding a job.
Section 12-105 requires whoever holds a permit under Title 12 to post the official street address in a conspicuous, weatherproof spot on the front of the property before work begins, and to keep it up until a permanent address marker is in place. Disputes over an inspector's ruling go to the code advisory/appeals board created by § 12-103, a thirteen-member body that by ordinance must include a master plumbing contractor, a mechanical contractor and a master electrical contractor among its voting seats; an appeal under § 12-104 must be filed in writing within ninety (90) days of the building or fire official's decision, accompanied by the appeal fee the department sets by resolution.
Section 12-106 makes it a misdemeanor to violate any adopted Title 12 code or to build, alter, repair, move or demolish a structure contrary to approved plans, punishable under the code's general penalty provision. Homeowners planning bathroom remodels, water-heater swaps or sewer-line repairs inside the City of Jackson, Tennessee need a plumbing permit before starting, not after an inspector finds unpermitted work.
Violations & Fines
Working without a plumbing permit, or plumbing in a manner that departs from the approved plans, is a misdemeanor under § 12-106, punishable according to the code's general penalty provision. The building and/or fire official can reject noncompliant work outright, and an owner has only ninety (90) days from that decision to file a written appeal with the code advisory/appeals board under § 12-104 before the ruling becomes final.
Frequently Asked Questions
Do I need a permit for a water heater replacement in Jackson, Tennessee?
What happens if I plumb without a permit in Jackson?
Can I appeal a plumbing inspector's decision?
Sources & Official References
Other rules in Jackson
Compare Jackson to another location·View the Tennessee building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.