Orem, UT Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
Utah State Construction Code (15A-2-103, -104)
Includes
International Plumbing Code component, statewide
Local adoption section
Orem City Code § 7-1-1
Permit prerequisite
Sewer/water lines installed before permit issues
Utility fees due
Sewer connection, sewer inspection, water meter/connection
Latest amendment
Ord. No. O-2025-0016, 12/9/2025

Summary

Orem City Code 7-1-1 adopts the Utah State Construction Code, defined in Utah Code 15A-2-103 and 15A-2-104, as the design and construction standard for every structure in the city, a package that bundles in the International Plumbing Code. No building permit covering plumbing work may issue until required utility fees are paid and utilities are in the ground.

The City hereby approves and adopts the State Construction Code, as defined in section 15A-2-103 and 104, Utah Code Annotated, as amended or superseded... are hereby adopted as the construction standards to be applied to the design, construction, quality of materials, erection, installation, alteration, remodeling, location, relocation, replacement, addition to, repair and other miscellaneous construction for existing buildings as well as new construction including the occupancy of all structures and buildings in the City of Orem. ... Building permits shall not be issued until all permit fees and City utility fees are paid, all required bonds are posted and all required documents are submitted. City utility fees may include, but are not limited to, sewer connection fee, sewer inspection fee, water meter fee, water connection fee and asphalt patching fee. No building permit shall be issued until the sewer and water lines have been installed to the lot and the final grade has been determined; provided, however, that the Director of Public Works may waive this requirement by written authorization.

Full Breakdown

Section 7-1-1 of Chapter 7, Building, Construction and Safety Codes and Regulations, states that the City hereby approves and adopts the State Construction Code, as defined in section 15A-2-103 and 104, Utah Code Annotated, as the construction standards applied to the design, construction, quality of materials, erection, installation, alteration, remodeling, and repair of every structure in the City of Orem. Utah's State Construction Code package, incorporated by reference under Utah Code 15A-2-103, bundles the International Plumbing Code together with the International Building, Residential, Mechanical, and Fuel Gas Codes and the National Electrical Code, so plumbing installations in Orem are inspected against that adopted edition rather than a locally written plumbing chapter.

Before any plumbing work tied to new construction can start, Section 7-3-1 requires that building permits shall not be issued until all permit fees and City utility fees are paid, all required bonds are posted and all required documents are submitted, and it specifically bars issuance until the sewer and water lines have been installed to the lot and the final grade has been determined, unless the Director of Public Works grants a written waiver. City utility fees tied to that permit include the sewer connection fee, sewer inspection fee, water meter fee, and water connection fee, all administered through the Department of Development Services.

Ordinance No. O-2023-0015, enacted June 27, 2023 and amended by Ordinance No. O-2025-0016 on December 9, 2025, is the most recent codification of the adoption section.

Violations & Fines

Working without the required permit, or starting plumbing-related construction before sewer and water lines are installed and fees are paid, violates Sections 7-1-1 and 7-3-1. The Chief Building Official can withhold or void a permit, and Development Services can issue a stop-work order; a related improvement bond can also be drawn down and, if it falls below the required threshold, the City may halt work until the bond is replenished.

Frequently Asked Questions

Does Orem have its own plumbing code?
No. Orem City Code 7-1-1 adopts Utah's State Construction Code, defined in Utah Code 15A-2-103 and 15A-2-104, as the design and construction standard citywide. That state package bundles the International Plumbing Code with the state's building, mechanical, fuel gas, and electrical codes, so Orem does not maintain a separate, locally written plumbing chapter.
Can I get a plumbing permit before utilities are installed?
No. Section 7-3-1 bars issuance of a building permit, which covers plumbing work tied to new construction, until the sewer and water lines have been installed to the lot and the final grade has been determined, unless the Director of Public Works grants a written waiver.
What fees come with a plumbing-related permit?
Section 7-3-1 lists City utility fees due before permit issuance, including a sewer connection fee, sewer inspection fee, water meter fee, and water connection fee, on top of standard permit fees and any required improvement bonds.

Sources & Official References

Other rules in Orem

All Orem rules

Compare Orem to another location·View the Utah building safety overview

Get notified when Plumbing Permits in Orem, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.