Key Facts

Adopted code
2025 CPC (2024 UPC base), § 15.04.050(E)
Local amendment
Mandatory cathodic protection, § 15.24.030(A)
Storm drain design rate
3 in/hr, § 15.24.030(C)
Unpermitted work fee
Up to 4x normal fee, § 15.08.080
Civil penalty
$250-$25,000/day, § 15.04.060

Summary

Sacramento adopts the 2025 California Plumbing Code (based on the 2024 Uniform Plumbing Code) by reference at City Code § 15.04.050(E), then locally amends it, including a stricter cathodic-protection standard for buried gas and water piping, at § 15.24.030, with permits issued under the same Title 15 permit procedure as every other trade.

The building standards included in the following parts of the 2025 California_Building_Standards_Code, Title 24 of the California_Code_of Regulations, are adopted by reference and incorporated in this code, except as expressly amended or superseded by the provisions of this code: ... E. The CPC, which is based on and which amends the provisions of the 2024 Uniform Plumbing Code, as published by the International Association of Plumbing and Mechanical Officials.

Full Breakdown

050 adopts the state model code and layers city amendments on top. 24 then makes Sacramento-specific edits. 4) installers must follow when sizing galvanic anodes for buried metal water and gas piping. 3, fixing the design rainfall rate for roof drains, conductors, leaders, gutters, and storm sewers at 3 inches per hour citywide. 050.

Violations & Fines

Plumbing work performed contrary to the adopted code, or without the required permit, exposes a responsible party to a misdemeanor for each day the violation continues and civil penalties of 'not less than two hundred fifty dollars ($250.00) or more than twenty-five thousand dollars ($25,000.00) for each day the violation continues' under § 15.04.060(A), plus a possible additional permit fee of up to four times the normal rate for work started without a permit under § 15.08.080.

Frequently Asked Questions

What plumbing code edition does Sacramento use?
The 2025 California Plumbing Code, adopted by reference at § 15.04.050(E), which is based on the 2024 Uniform Plumbing Code, modified by Sacramento's own local amendments in Chapter 15.24.
Does Sacramento require cathodic protection on buried gas and water pipe?
Yes. Section 15.24.030(A) rewrites CPC § 312.4 to require that all buried ferrous piping used for potable water or gas supply be installed with cathodic protection, with a city-specific anode-sizing table for galvanic anodes.
Can I start plumbing work before my permit is issued?
No. Section 15.08.080 lets the chief building official charge up to four times the normal plan review and permit fees for work commenced before the required permit is obtained, on top of any other penalties under the code.

Sources & Official References

Other rules in Sacramento

All Sacramento rules

California rules heatmap·Compare Sacramento to another location·View the California building safety overview

Get notified when Plumbing Permits in Sacramento, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Sacramento County handle plumbing permits.

Folsom, CA
Some Restrictions
Rancho Cordova, CA
Some Restrictions
Elk Grove, CA
Some Restrictions